Building Name |
Building Number |
Building Address |
Project Name |
Proposed Maintenance |
Building Use |
Managed by |
|
|
Energy Savings Initiatives with a > 3 year ROI |
|
|
|
|
Student WF |
|
Campus wide |
New Furnaces |
Replace old furnaces in 7-8 houses (Year 4 of 10 year program) Locations to be identified on an as needed basis. |
SLF-WF |
Mike C |
Campus Wide |
|
Campus wide |
Steam Trap Replacement |
Replace steam traps in steam distribution system. |
INFRA |
PCS |
Student WF |
|
Campus wide |
New Windows |
Replace old windows w/energy efficient windows and half screens (Year 4 of 7). Provide security stops on all first floor windows. |
SLF-WF |
RZS |
Campus Wide |
|
Campus wide |
Bridge Valve Temperature Sensors |
Replace sensors used to control chilled water bridge valves. |
INFRA |
PCS |
Student WF |
|
Campus wide |
Replace basement hatchways |
Replace rotted basement hatchways. Locations to be identified on an as needed basis.Ongoing project |
SLF-WF |
TP |
Student WF |
|
Campus wide |
Gutter cleaning |
Clean gutters of all all wood frame houses.Ongoing project |
SLF-WF |
TP |
Student WF |
|
Campus wide |
Storm window replacements |
Replace/install storm window during summer maintenance. Locations to be identified on an as needed basis.Ongoing project |
SLF-WF |
TP |
Campus Wide |
|
Campus Wide |
Plumbing Upgrades |
Identify and correct plumbing related issues in various residential properties. Year 3 of 5 year plan. Locations to be identified on an as needed basis.Ongoing project |
SLF-WF |
Mike C |
Woodframe / Non-Traditional Dorm / Program House |
|
Campus wide |
Appliance replacement allowance |
Replace kitchen appliances (refrigerators and stoves); annual allowance. Ongoing project |
SLF-WF |
Mike C |
Student WF |
|
Campus wide |
Kitchen/common area floor replacements |
Replace damaged sheet vinyl flooring with VCT. Install new plywood subfloor. Location: 35 & 56 Fountain Avenue. |
SLF-WF |
RZS |
Campus roofs |
|
Campus wide |
OSHA Fall Protection Allowance |
Install fall protection gates at unprotected roof hatches (e.g. Foss Hill), Install fall protection at unprotected skylights (e.g.. Freeman)Ongoing project |
CAMPUS |
TP |
Non-Traditional Dorm / Program House |
|
Campus wide |
Carpet replacement |
Annual allowance to replace carpeting throughout residential facilities based on 5 year replacement schedule. Locations to be identified on an as needed basis. |
SLF |
RZS |
High Rise |
110 |
Church St |
Building security |
Add 2nd card access door beyond laundry room, I |
SLF |
RNS |
High Rise |
110 |
Church St |
Door Upgrades |
Replace west entrance door. |
SLF |
RNS |
High Rise |
110 |
Church St |
4th and 5th floor renovation |
Renovate Kitchens and bathrooms in each apartment on the 4th and 5th floors. Total renovations include kitchens & bathrooms same scope as upper floors in High Rise, replace base molding throughout and paint entire unit (ceilings included). Replace hallway carpeting, paint corridor walls/ceilings, replace common area lighting and common area emergency lighting and replace smoke detectors. Demo closet in existing 2-bed units and install new ceiling lighting in common area. Install wall hung counters to eliminate kitchen tables. Replace all sprinkler heads in units with new quick response heads. Replace all ceiling lighting. Install new wall switches for all new lighting installed. Replace all smoke detectors with new. Replace existing t-stats with lite-stats. Install access panels and shut offs for all supplies in chase in bathrooms and kitchens. Provide strapping and anchorage for fin tube radiation. |
SLF |
RNS |
Non-Traditional Dorm / Program House |
200 |
Church St |
Install security card access control system |
Install security card access control system and perform door repairs to provide sufficient card access for front, side and fire escape doors. |
SLF |
RZS |
Shanklin |
237 |
Church St |
Repair Chilled water vault B |
Repair leak and associated items in chilled water vault B. |
ACAD |
PCS |
Exley Science Center Library |
265 |
Church St |
Door Upgrades |
Replace library stairwell door on 1st floor (does not close properly to provide a smoke barrier to basement). Replace closet door. |
ACAD |
SJH |
Science Library |
265 |
Church St |
Carpet replacement - 2nd floor |
Replace carpet on 2nd floor of Science Library. Requires relocation of all stacks. |
ACAD |
BH |
Exley Science Center Library |
265 |
Church St |
Fire Alarm System - Phased Installation |
Phased installation of new fire alarm system to include Science Library - 1st and 2nd floors. |
ACAD |
BS |
Exley Science Center |
265 |
Church St |
Fire Alarm System - Phased Installation |
Phased installation of new fire alarm system to include Lower level, including halls, machine shop, classrooms and labs. |
ACAD |
BS |
Exley Science Center |
265 |
Church St |
Rebuild AHU 9 |
Replace all components of air handler. Coils, dampers, valves, related piping, blowers, motors etc. Update DDC controls. |
ACAD |
Mike C |
Clark Hall |
268 |
Church St |
Bathroom floor replacements |
Replace bathroom floors on second and third floors. Reestablish lounge area on basement level. |
SLF |
TP |
Graduate |
258 |
Court St |
Paint exterior, replace porches |
|
RP |
RZS |
Student WF |
|
Earth House - 159 High St |
Window Replacement |
Replace all windows with insulated glass windows and half screens. Paint. |
SLF |
RZS |
Non-Traditional Dorm / Program House |
|
Eclectic - 200 High St |
Eclectic Fire Escape Repair and Painting |
In progress |
SLF |
TP |
Non-Traditional Dorm / Program House |
|
Eclectic - 200 High St |
Ground Fl. Bathroom Reno. |
|
SLF |
RZS |
Non-Traditional Dorm / Program House |
|
Eclectic - 200 High St |
Lock Installation |
Install code locks and panic device on 2nd fl hallway door to prevent others from going into space during events. |
SLF |
SJH |
Freeman Athletic Center |
|
Fields |
Reno fields |
Continue renovating fields to reduce athletic injuries. |
ATH |
DIH |
Van Vleck Observatory |
11 |
Foss Hill Dr |
Window Replacement |
Replace all windows with new double insulated glass windows with half screens. Provide window treatment, blinds etc. |
ACAD |
RZS |
Foss Hill 2 |
|
Foss Hill Dr |
Roof replacement |
Roof is in need of replacement, Active leak exists 3883 sf |
SLF |
TP |
Foss Hill 3-5.5 |
|
Foss Hill Dr |
Building Insulation |
|
SLF |
Mike C |
Student WF |
2,6,7,57 |
Fountain Ave |
Paint porch decks, rails, stairs |
Paint porch decks, rails, stairs, ceiling, columns, doors and trim as identified. |
SLF-WF |
RZS |
Student WF |
|
Fountain Ave |
|
Repair exterior stucco. Replace windows. Wrap exterior windows trim with aluminum. Paint all paintable surfaces. Install new gutter and leaders, replace rear porches. |
SLF-WF |
RZS |
Student WF |
15 |
Fountain Ave |
Replace roofs |
|
SLF-WF |
RZS |
Student WF |
35 |
Fountain Ave |
Replace Windows / Porch replacement |
Replace windows. Paint all paintable surfaces. Demo and construct new front and rear porches. |
SLF-WF |
RZS |
Student WF |
40 |
Fountain Ave |
|
|
SLF-WF |
RZS |
Student WF |
40, 42 |
Fountain Ave |
Kitchen Renovations |
Total renovate of kitchens. New walls, cabinets, electrical, finishes, appliances. |
SLF-WF |
RZS |
Student WF |
40, 43, 57 |
Fountain Ave |
Bathroom floor replacements |
Replace damaged sheet vinyl flooring with VCT. Remove and install new plywood subfloor. |
SLF-WF |
RZS |
Student WF |
41 |
Fountain Ave |
Gutters/Rear Porch/Painting |
Install gutters. Repair/replace rear porch and sidewalk leading to front of house. Repair/Paint front porch |
SLF-WF |
RZS |
Student WF |
42 |
Fountain Ave |
Reno Exterior & Replace Windows/ Replace Roof |
Paint Exterior. Replace windows. Perform stucco repairs. Address porches. |
SLF-WF |
RZS |
Student WF |
51 |
Fountain Ave |
Exterior wood siding repair / Porch replacements |
Exterior wood siding repair with paint touch up. Replace front and rear porches. |
SLF-WF |
RZS |
Student WF |
56 |
Fountain Ave |
Paint or Vinyl Side Exterior & Replace Windows |
Paint or Vinyl Side Exterior & Replace Windows |
SLF-WF |
RZS |
Student WF |
64 |
Fountain Ave |
Paint Exterior & Replace Windows |
Paint Exterior & Replace Windows. |
SLF-WF |
RZS |
Student WF |
64 |
Fountain Ave |
Reno 6 Bed House (Existing 2 family 3/3 conversion to single family) |
Replace plaster walls and ceilings. Reno kitchen and bathrooms. Relocate entry door to bedroom from kitchen to living room. Move walls to provide better sized bedrooms. Demo south stair tower. Remove second floor kitchen and expand common room, building closets, paint interior. New flooring. New electrical. Maintenance to heating system, new fin tube radiators to be installed. |
SLF-WF |
RZS |
Graduate |
136 |
High St |
Roof Replacement |
Replace roof, gutters, leaders, downspouts. Flash and repoint chimney. |
RP |
MF |
Non-Traditional Dorm / Program House |
156 |
High St |
Lounge Renovation - 2nd floor |
Renovate 2nd floor lounge to create a full kitchen. - Minor renovation to space to install stove/oven, enlarge hard surface floor area, move refrigerator and install island counter space. |
SLF |
BH |
North College |
237 |
High St |
Replace Mech system in north mech room |
Remove all piping, pumps, valves and related system and install new. Install new piping, valves, insulation, and DDC controls. Paint walls and floor and replace lighting. |
ADM |
PCS |
CAMS |
255 |
High St |
Exterior Paint |
Funds from #16 - 258 Court Street to be used to address exterior prep and paint and minimal carpentry work. Proposal pricing will be obtained to prep the exterior clapboard as economically as possible and paint the exterior of the building. |
ACAD |
TP/RZS |
Fisk Hall |
262 |
High St |
Repair manhole No. 10 |
Repair defective components within manhole. In progress |
ACAD |
PCS |
DAC/Alsop House |
301 |
High St |
|
Replace two fan coil type units that serve the east wing. In scheduling |
ACAD |
Mike C/RZS |
Davison Art Center |
301 |
High St |
Sidewalk repair |
Replace bluestone sidewalk on High St from Davison Art Center sidewalk to Wyllys Ave with concrete sidewalk. |
ADM |
DH/RZS |
Davison Art Center |
301 |
High St |
Loading Dock Door Replacement |
Replace double doors at loading dock to match new entry door. |
ACAD |
RZS |
Univ. Relations & Alum |
318 |
High St |
Paint Exterior |
Paint exterior in its entirety including metal railings and metal ramp at north elevation. |
ADM |
RZS |
Univ. Relations & Alum |
330 |
High St |
Basement Flooding |
Install trench drain and seal all openings into basement. |
ADM |
DH |
CAAS |
343 |
High St |
Porch/stair repair |
Front porch/wooden stairs replaced. Install Railing. |
ACAD |
RZS |
CAAS |
343 |
High St |
Moisture Problem |
Significant leaking during rain creating a mold issue in basement. Permeates through building. Install 3" OD weep holes in face of wall 15' oc. Waterproof 2 sections of basement wall by injection. |
ACAD |
|
CAAS |
343 |
High St |
Carpeting |
Replace carpeting in foyer on main floor common areas and stairs. |
ACAD |
RZS |
Butterfield B |
20 |
Huber Ave |
Kitchen |
Provide common area kitchen space for student use similar to those provided in other dorms. Build secured space in lounge. Also address shelving replacement, lighting, finishes. Modify sprinkler as required. Install heat detector. Address mechanical return diffuser. Design by Noyes Vogt Architects. |
SLF |
RZS |
Butterfield C |
50 |
Huber Ave |
Interior Safety- Install door hold opens |
Install Magnetic hold open devices on all stairwell/corridor doors. This is the final building to be addressed. Improves student living. WORK COMPLETED DURING WINTER BREAK. |
SLF |
RZS |
Neighborhood Pre School |
20 |
Lawn Ave |
Vinyl Side Exterior |
Vinyl Side exterior of house, remove all lead paint. Wrap window trim. |
RP |
RZS |
Student WF |
22 |
Lawn Ave |
Repoint Chimney |
Rebuild/repoint existing chimney. Remove antenna. |
SLF-WF |
RZS |
Program House |
22, 28, 73 A & B |
Lawn Ave. |
UG Fire Sprinkler |
Install new fire alarm and fire sprinkler systems in Program Houses with 5+ beds. |
SLF-WF |
BS |
Student WF |
211 |
Pine St |
Egress Stairs |
Replace existing rear egress stairs. Existing are cast-in-place concrete. |
SLF-WF |
RZS |
Student WF |
215 A&B |
Pine St |
Replace front porch and rear entry stairs/landing |
Demo existing front porch and replace with composite material.Demo concrete stairs and landings at rear entry and replace with composite material. |
SLF-WF |
RZS |
Student WF |
269 |
Pine St |
Chimney Repair |
Repoint exposed portion of chimney |
SLF-WF |
RZS |
Student WF |
|
various |
Hood fan installation |
Install hood fans - and cabinet if required - in kitchens. Prioritize houses with fire alarm systems that report to MFD. Summer 2009 |
SLF-WF |
Mike C |
Student WF |
7 |
Vine St |
Remove Carpet |
Please remove carpet & install new vct or vinyl flooring at entry. Determine if wood floor can be refinished in living room. |
SLF-WF |
RZS |
Student WF |
23A |
Vine St |
Bathroom floor |
Replace bathroom floor to include new subfloor. Install base. Trim bottom of door. |
SLF-WF |
RZS |
Student WF |
23B |
Vine St |
Kitchen & Bathroom floor replacement |
|
SLF-WF |
RZS |
CFA M - Zilkha Gallery |
283 |
Washington Terr |
Replace roof |
Roof is in need of replacement, Active leak exists ,7316 sf |
ACAD |
TP |
CFA R - Dance Studio |
283 |
Washington Terr |
Replace air handler in carpenters shop |
|
ACAD |
Mike C/RZS |
CFA M - Zilkha |
283 |
Washington Terr |
Re-piping of HVAC equipment |
Replace existing duplex pumping station with VFD rated pumps, install VFD to modulate pump speed, replace all 3-way valves with 2-way valves, add DDC and re-insulate. Addresses 2 air handling units. |
ACAD |
PCS |
Low Rise |
223 |
William St |
Replace feeders |
Replace all existing electrical feeders from High Rise to D and E, and from High Rise to B and C |
SLF |
Mike C |
CPP |
280 |
William St |
Manhole Inspection |
Inspect condition of manholes and equipment located within manholes. |
INFRA |
PCS |
CPP |
280 |
William St |
Oil Fill Monitoring |
Replace defective oil fill monitoring system. |
INFRA |
PCS |
CPP |
280 |
William St |
Boiler Cleaning |
Clean CPP Boilers and Related components. |
INFRA |
PCS |