Addenda
Return to MM FY18 page
Please note the deadline for RFI submission is March 28, 2017 at 12:00 pm
___________________________________________________________________________________________________________________
General Contractor 2 walk held on 3/16/17
Addendum #1 dated 3/23/17.
Locations addressed in this addendum:
- Pre-bid conference notes
- South College Connector 1st Floor connector Replacement/2nd Floor Window Replacement
- CFA G Art Studio South Ne Aluminum Storefront and Doors to Room 105
- Foss Hill 1-10 New Bathroom Cubbies
General Contractor 2 walk held on 3/16/17
-Addendum #2 dated 3/27/17.
- General Contractor Bid Proposal Form 3/27/2017
Locations addressed in this addendum:
___________________________________________________________________________________________________________________
___________________________________________________________________________________________________________________
General Contractor walk held on 3/15/17
Addendum #1 dated 3/24/17.
Locations addressed in this addendum:
- Pre-bid conference notes
- 71 Lawn Ave, Vinyl Siding / Window Replacement Project
- 161 Cross Street – Freeman Athletic Center Natatorium Hockey Rink Exterior Repairs
- 200 High Street Building 1st Floor Selective Structural Reinforcing
- 45 Wyllys – Stair Base Treatment at Usdan
General Contractor walk held on 3/15/17
Addendum #2 dated 3/29/17.
Locations addressed in this addendum:
- General Contractor Bid Proposal Form 3/27/2017
___________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________
Site Contractor walk held on 3/17/17
-Addendum #1 dated 3/27/17.
-Sitework Contractor Bid Proposal Form 3/27/17
Locations addressed in this addendum:
- Pre-bid conference notes
- Freeman Athletic Center Warren Street Sidewalk
- Hall Atwater Perimeter Walkways/Stair Replacement
- Exley Science Center New Accessible Entry at South Entrance
- Olin Library North Walk Replacement
- 318 High Street North Ramp Replacement
- Soil Erosion and Sedimentation Control Notes for all sitework projects
Site Contractor walk held on 3/17/2017
Addendum #2 dated 3/29/17.
Locations addressed in this addendum:
- 318 High Street North Ramp Replacement
Site Contractor walk held on 3/17/2017
Addendum #3 dated 4/3/17
Revised Proposal Form Dated 4/3/2017
________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________
Roofing Contractor walks held on 3/13/17 and 3/15/17
- Addendum #1 dated 3/27/17.
- Hall Atwater Loading Dock Proposal Form dated 3/27/17.
- Olin Library Bid Form dated 3/27/17.
Locations addressed in this addendum:
- Pre-bid conference notes
- Olin Library
- Hall Atwater Loading Dock
- Hall Atwater Upper Roofs – general information
- 200 High Street – general information
Roofing Contractor walks held on 3/13/17 and 3/15/17
Addendum #2 dated 3/29/17.
Locations addressed in this addendum:
- Olin Library
- Hall Atwater
Roofing Contractor walks held on 3/13/17 and 3/15/17
Addendum #3 dated 3/30/17.
Locations addressed in this addendum:
Roofing Contractor walks held on 3/13/17 and 3/15/17
Addendum #4 dated 3/30/17.
Locations addressed in this addendum:
Roofing Contractor walks held on 3/13/17 and 3/15/17
Addendum #5 dated 3/31/17.
___________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________
Fire Alarm Contractor walks held on 3/16/17
- Addendum #1 dated 3/28/17.
- Fire Alarm Contractor Bid Proposal Form 3/28/17
Locations addressed in this addendum:
- Pre-bid conference notes
- HighRise
Fire Alarm Contractor walks held on 3/16/17
Addendum #2 dated 3/30/17.
Location addressed in this addendum:
- HighRise
Fire Alarm Contractor walks held on 3/16/17
Addendum #3 dated 4/11/17.
Location addressed in this addendum:
- HighRise