Description of Work |
Building Name |
Address |
Managed By |
Schedule Start |
Photos / Scope |
Awarded Contractor |
Renovate all apartments on the 2nd and 3rd floors of High Rise as performed on upper floors. Reno one efficiency to ADA as performed in unit 509.
|
High Rise
|
110 Church St
|
Roseann Sillasen
|
May 24, 2011
|
Drawings Scope
Spec Sec 16500
|
Aresco Construction
|
Freeman Athletic Center - Andersen Track Replacement design services
|
Freeman Athletic Center
|
161 Cross St
|
Roseann Sillasen
|
5/10/11
|
Track Investigation Report 2005
|
Clough, Harbour & Associates
|
Admissions: Replace carpet in McKelvey Room. Review wall finish needs.
|
Admissions
|
70 Wyllys Ave
|
Brandi Hood
|
Completed
|
|
|
Renovate kitchen; cabinets, flooring, wall replacement, insulation, fixtures. General trades, plumbing, electrical. Click to go to drawings of 1st floor existing and 1st floor proposed.
|
Non-Traditional Dorm / Program House
|
Turath House - 22 Lawn Ave
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
Scope Construction
|
Replace windows with new double insulated glass windows. Remove weights, insulate cavities, create a water/weather tight installation. Wrap exterior trim and sill. Interior trim repair/paint.
|
Student WF
|
215 A&B Pine St
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
Carpentry Trades
|
Renovate kitchen. Enlarge bathroom on 2nd floor. New VCT and sheet vinyl flooring. Screen wood floors. Patch and paint interior in toto. Upgrade electrical to provide grounded outlets in bedrooms and living room. New plumbing throughout/reroute sanitary lines. Install GFI outlets in kitchen and bath. Paint exterior porches and all trim, doors. Clean gutters. Replace smoke detectors. Install stand alone CO detectors. Autocad Drawings
|
Student WF
|
125 Cross St
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
CSS Morello
|
Remove rear egress stairs Reframe opening to accept new wall and window. Patch vinyl siding with new.
|
Student WF
|
6 Warren
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
KBE Building Corp
|
Replace windows with new double insulated glass windows. Remove weights, insulate cavities, create a water/weather tight installation. Wrap exterior trim and sill. Interior trim repair/paint. Exterior power washing / gutter installation & egress path grading and steps.
|
Student WF
|
42 Miles Ave
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
Brown and Wimler
|
Stain exterior of house. Address carpentry items. Reno interior to provide 2 new bedrooms. Interior finishes, fire alarm, sprinkler system.
|
Graduate
|
124 High St
|
Roseann Sillasen
|
June 1, 2011
|
Photo Drawings Scope
|
Scope Construction
|
Vinyl side exterior-match existing architectural features. Replace windows with new double insulated glass windows. Remove weights, insulate cavities, create a water/weather tight installation. Wrap exterior trim and sill. Interior trim repair/paint.
|
Student WF
|
2 Fountain Ave
|
Roseann Sillasen
|
June 8, 2011
|
Photo Scope
|
CSS Morello
|
Renovate house. Replace plaster walls and ceilings. Upgrade electrical. Vinyl side house. Replace main entry stairs; address porch. Carpentry repairs to exterior. New rear entry door. Paint doors, front and rear porches, basement door/hatchway and all interior surfaces. Reno kitchen; eliminate pantry and renovate bathrooms. Reinstall exterior lighting. Insulate attic and walls.
|
Student WF
|
24 Fountain Ave
|
Roseann Sillasen
|
June 1, 2011
|
Sketch A1 Drawings Photo Scope
|
CSS Morello
|
Re-carpet all hallways with carpet tile and install composite material on stairwell landings. Coordinate with fire alarm installation.
|
Butterfield B
|
Lawn Ave
|
Brandi Hood
|
June 1, 2011
|
|
|
Install vinyl siding over existing horizontal wood siding. Provide specialty options for scallop replacement. Replace entry stair system with composite material. Maintain exterior window trim-paint.
|
Student WF
|
107 Cross St
|
Roseann Sillasen
|
July 11, 2011
|
Photo Scope
|
Brown and Wimler
|
Replace 10 roof top exhaust fans. Address electrical disconnect/connections and roof curb repairs. Coordinate work with roofing manufacturer (Suprema) to maintain warranty.
|
High Rise
|
110 Church St
|
Roseann Sillasen
|
July 18, 2011
|
See HighRise scope above
|
Aresco Construction
|
Replace interior ceiling lighting with new lighting. Replace wiring.
|
Davison Art Library
|
301 High St
|
Roseann Sillasen
|
August 15, 2011
|
Photo Scope
|
|
Provide card or combination locks to replace existing locking hardware.
|
Freeman Athletic Center-Hockey Area
|
161 Cross St
|
Tom Policki
|
May 24, 2011
|
Photo Scope
|
|
Scrape, prime and paint all exterior surfaces. Repair damaged and replace rotted wood surfaces with low maintenance composite material. Repoint brick. Caulk perimeter of windows.
|
PAC
|
238 Church St
|
Roseann Sillasen
|
May 24, 2011
|
Specifications revised
Photo Scope
|
Superior Finishes
|
Renovate existing 6 bed 2-family house. New kitchens (2), bathrooms (2), refinish floors, new lighting, upgrade electrical, paint interior and vinyl side exterior, new insulated glass windows; wrap exterior wood trim, insulate attic/walls. Remove south porch on 2nd floor and infill door opening, rebuild 1st floor porch. Reno rear entry enclosure.
|
Student WF
|
86 Lawn Ave
|
Roseann Sillasen
|
May 24, 2011
|
Drawings Photo Scope
|
Brown and Wimler
|
Install new addressable, voice command fire alarm system in Butterfield B.
|
Butterfield B
|
Lawn/Huber Ave
|
Roseann Sillasen
|
May 10, 2011
|
Photo Scope
|
Beacon Electric
|
Install vinyl siding over existing horizontal wood siding. Renovate west porches to code.
|
Student WF
|
239 Pine St
|
Roseann Sillasen
|
June 25, 2011
|
Photo Scope
|
CSS Morello
|
At south storage doors-replace doors and hardware. At north exit and northeast entrance doors - replace exit devices, closers, and weatherstrip. Reinforce frame header, replace closers, and exit devices
|
Freeman Athletic Center-Bacon Field House
|
161 Cross St
|
Tom Policki
|
TBD
|
Photo Scope
|
|
Roofing material under existing stone walkway has failed. Leaks present with each rain. Interim fixes performed but are short term. Require design and replacement of roofing material, steel framing, insulation, waterproofing and reinstallation of bluestone walk and interior finishes. Additional drainage also required. Closure of Foss Hill 9 & 10 required to perform the work.
|
Foss Hill 9-10
|
Foss Hill Dr
|
Roseann Sillasen
|
May 24, 2011
|
Drawings
|
Brown and Wimler
|
Vinyl side exterior of building. Exterior carpentry repairs.
|
PIMMS
|
210 (178) Cross St
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
CSS Morello
|
Refinish kitchen, bathroom and/or common room hardwood floors in each location as identified.
|
Student WF
|
Locations to be determined
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
|
Replace existing mailboxes with new. Replace 2 remaining doors with new to match #274 entrance door. Replace four rear security doors. Provide all hardware; coordinate with in-house locksmith. Patch frames as required. Paint.
|
Faculty/Staff
|
272-278 Court St
|
Roseann Sillasen
|
July 18, 2011
|
Photo Scope
|
CSS Morello
|
Remove, as identified, existing scrim and prop bars and install new Vortek systems. Number of line sets to be determined based on cost.
|
CFA P - Theater
|
283 Washington Terr
|
Roseann Sillasen
|
May 23 - June 20, 2011
|
Photo Scope
|
SuperTech
|
Replace 5 exterior doors of the building with new insulated doors that provide increased security, better weather barrier, and functioning window treatments.
|
Van Vleck Observatory
|
11 Foss Hill Dr
|
Roseann Sillasen
|
July 7, 2011
|
Photo Scope
|
Brown and Wimler
|
Perform renovations in Romance Languages to include ADA access and bathroom. Coordinate and prioritize work with needs of building to fall within allocated funding. Install card access.
|
Department of Romance Languages & Literatures
|
300 High St
|
Roseann Sillasen
|
June 8, 2011
|
Drawings Scope
|
KBE Builders
|
Replace windows with new double insulated glass windows. Remove weights, insulate cavities, create a water/weather tight installation. Wrap exterior trim and sill. Interior trim repair/paint
|
Student WF
|
72 A+B Home Av
|
Roseann Sillasen
|
July 18, 2011
|
Photo Scope
|
CSS Morello
|
Replace sliding glass doors of the interior courtyard of the annex. Renovate existing lower glass openings and replace with new insulated half wall. Replace sliding doors from hallway to courtyard with new door system to provide a weather proof installation and accommodate maintenance needs. Replace sliding glass doors from 2 bedrooms with framed wall and window.
|
Non-Traditional Dorm / Program House
|
Full House / Writing House - 202 Washington St
|
Roseann Sillasen
|
July 2, 2011
|
Drawings
|
Carpentry Trades
|
Install new walk from rear egress to concrete walk at street line.
|
Non-Traditional Dorm / Program House
|
Community Services - 28 Lawn Ave
|
Dave Hall
|
May 24, 2011
|
|
|
Replace/repair railings and stairs in exterior courtyard.
|
Butterfield C
|
50 Huber Ave
|
Dave Hall
|
August 2011
|
|
|
Replace west exterior entrance door and frame to classroom-maintain historic detail. Repair east basement entry door.
|
Religious Studies
|
171 Church St
|
Roseann Sillasen
|
August 2, 2011
|
Photo Scope
|
KBE
|
Paint exterior stucco façade. Paint all paintable surfaces. Repair porch.
|
Student WF
|
46 Fountain Ave
|
Roseann Sillasen
|
June 18, 2011
|
Photo Scope
|
Superior Finishes
|
Refinish all entry doors.
|
Fisk Hall
|
262 High St
|
Roseann Sillasen
|
August 2, 2011
|
Photo Scope
|
Sifco
|
Replace the old irrigation heads and swing joints.
|
Freeman Athletic Center
|
161 Cross St
|
Dave Hall
|
TBD
|
|
|
House renovation, floor reinforcement and new finishes. Address mechanical/electrical. New kitchen and bathrooms. Address exterior needs. Install supports in basement to better support first floor.
|
UG Woodframe
|
192 Cross St (166 Cross St)
|
Roseann Sillasen
|
June 10, 2011
|
Drawings Photo Scope
|
CSS Morello
|
Repair southeast ground floor foyer from patio where water enters - Lawn Ave entrance.
|
Hall Atwater
|
237 Church St
|
Roseann Sillasen
|
TBD
|
Photo Scope
|
|
Renovate bathrooms. Repair/replace plaster walls. Refinish floors, electrical upgrades to code. Mechanical needs.
|
Student WF
|
42 Fountain Ave
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
CSS Morello
|
Replace the 6 exterior doors & hardware. Replace interior door locks.
|
Freeman Athletic Center-Pool Area
|
161 Cross St
|
Tom Policki
|
May 24, 2011
|
Photo Scope
|
|
Paint all paintable exterior surfaces. Carpentry repairs.
|
Student WF
|
34 Fountain Ave
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
CSS Morello
|
Install card access on entrance doors. Install prop alarms on other perimeter doors.
|
Malcolm X
|
343 High St
|
Roseann Sillasen
|
July 18, 2011
|
|
Integrated Security Group
|
Basement water infiltration.
|
CAAS
|
345 High St
|
Roseann Sillasen
|
TBD
|
Photo Scope
|
|
Chimney repointing and flashing. Replace windows with new double insulated glass windows. Remove weights, insulate cavities, create a water/weather tight installation. Wrap exterior trim and sill. Interior trim repair/paint.
|
Faculty/Staff
|
79 Lawn
|
Roseann Sillasen
|
July 25, 2011
|
Photo Scope
|
CSS Morello
|
Replace windows with new double insulated glass windows. Maintain historic details. Remove weights, insulate cavities, create a water/weather tight installation. Wrap exterior trim and sill. Interior trim repair/paint. Repair/paint metal terraces.
|
Non-Traditional Dorm / Program House
|
Bayit - 157 Church St
|
Roseann Sillasen
|
July 11, 2011
|
Photo Scope
|
Brown and Wimler
|
Replace existing generator with 8 kW generator.
|
Foss Hill 4
|
Foss Hill Dr
|
Mike Conte
|
July 7, 2011
|
Photo Scope
|
|
Replace windows with new double insulated glass windows. Remove weights, insulate cavities, create a water/weather tight installation. Wrap exterior trim and sill. Interior trim repair/paint.
|
Faculty/Staff
|
41/43 Brainerd
|
Roseann Sillasen
|
May 24, 2011
|
|
Carpentry Trades
|
Demolish 5 garages. Locations to be determined.
|
Campus Wide
|
Campus wide
|
Bill Nelligan
|
TBD
|
Photo Scope
|
|
Renovate kitchen and bathroom.
|
Graduate
|
39 Brainerd
|
Roseann Sillasen
|
June 1, 2011
|
Drawings Photo Scope
|
CSS Morello
|
Renovate kitchen and bathroom. Address electrical and plumbing. Patch and paint all walls. Floor finish replacement. Repair front porch & paint. Replace windows in unit with new double insulated glass windows. Remove weights, insulate cavities, create a water/weather tight installation. Wrap exterior trim and sill. Interior trim repair/paint. Address vacant unit.
|
Graduate
|
140 Church St
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
CSS Morello
|
Replace upper cabinets, replace floor, replace entry doors.
|
Student WF
|
8 Warren St
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
Scope Construction
|
Address electrical upgrades in woodframes to provide grounded outlets. Locations to be identified.
|
Student WF
|
Campus wide
|
Roseann Sillasen
|
May 24, 2011
|
|
|
Install card access and prop alerts on exterior doors.
|
190 High Street
|
190 High St
|
Roseann Sillasen
|
Completed
|
|
ISG
|
Install privacy panels at urinals in mens rooms on basement and third floor levels.
|
PAC
|
238 Church St
|
Roseann Sillasen
|
Completed
|
|
CSS Morello
|
Make repairs to bluestone entry to make safe. Replace identified bluestone, set in secure base.
|
PAC
|
238 Church St
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
|
Replace carpet in room 208. Use carpet from 208 to patch corridor carpet.
|
Chaplain's Offices
|
169 High St
|
Tom Policki
|
Completed
|
|
|
Install mini-blinds on windows surrounding the vestibule entry to decrease heat gain in summer. Install new entry door.
|
Davison Art Library
|
301 High St
|
Roseann Sillasen
|
Completed
|
Photo Scope
|
Mini-Blinds: Alpha Aero
|
Repair stucco, remove vines and paint exterior.
|
Student WF |
127 Cross St |
Roseann Sillasen
|
July 7, 2011
|
Photo Scope
|
Sifco
|
Renovate existing stone steps and replace railing system. Continuous problem with breakage and delamination.
|
Foss Hill 8 |
Foss Hill Dr |
Dave Hall
|
May 24, 2011
|
Drawings
|
Brown and Wimler
|
Vinyl side exterior. Wrap window trim and stops. Prep and paint wood surfaces. Perform minor carpentry to exterior.
|
Student WF |
146 Cross St |
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
Pizzuto Builders
|
Vinyl side exterior of entire building. Wrap window trim. Perform carpentry work to front porch and trim. Provide separate cost to replace windows with double insulated glass.
|
Upward Bound |
41 Lawn Ave |
Roseann Sillasen
|
July 15, 2011
|
Photo Scope
|
CSS Morello
|
Install intermediate railing
|
CFA Theater |
Washington Terr |
Roseann Sillasen
|
TBD
|
Photo Scope
|
|
Roof replacements:Freeman Athletic Center: Replace roofing over Cross St lobby entry, administrative offices and coaches offices: Cross Street Elevation. Brick and stucco repairs; carpentry. Removal of phenolic insulation/metal deck treatment. Public Safety / Judd Hall Portico roof / Foss Hill 1
200 High chimney flashing
|
Campus Wide
|
various locations
|
Roseann Sillasen
|
May 24, 2011
June 28, 2011
August 1, 2011
|
FAC Drawings FAC Spec1 FAC Spec 2a FAC Spec 2b
Foss Hill 1 / DAC / Public Safety /Front End Docs
Judd Hall Portico roof Front End Docs
|
FAC: Macri Roofing
DAC: Eagle Rivet
Public Safety & Judd Hall: Macri Roofing
|
Perform exterior carpentry repairs on Shanklin Lab Building; address coping. Paint
|
Shanklin/Hall-Atwater
|
Church St
|
Rob Schmidt
|
TBD
|
Photo Scope
|
|
Annual Weatherization Upgrades per Energy Audit Reports-WF insulation. Final locations to be determined.
|
Campus Wide
|
Fountain/Home
|
Roseann Sillasen / Bill Nelligan
|
May 24, 2011
|
Photo Scope
|
Lantern Energy
|
Vinyl side exterior. Replace windows with new double insulated glass windows. Remove weights, insulate cavities, create a water/weather tight installation. Wrap exterior trim and sill. Interior trim repair/paint
|
Student WF
|
35 Home Ave
|
Roseann Sillasen
|
TBD
|
Photo Scope
|
|
Perform classroom renovations; address needs identified from outcome of 11/15/2010 classroom committee meeting
|
Campus Wide
|
various locations
|
Roseann Sillasen
|
TBD
|
Photo Scope
|
|
Central Power Plant Condition Study Outcomes; potential work may include trench piping replacement, cooling tower upper baffle replacement, motor control center #2, sewage ejection pump, improvements to breach, steam piping insulation or retubing of boiler No.2.
|
CPP
|
William St
|
Peter Staye
|
TBD
|
|
|
Inspect and repair/replace bridge panel motors. Motors leak oil.
|
CFA P - Theater
|
283 Washington Terr
|
Roseann Sillasen
|
TBD
|
Photo Scope
|
|
Paint all paintable exterior surfaces including the Dryvit surfaces. Initiate work at the northeast elevations. Soffits beginning to deteriorate. Address with roof replacement. Caulk building joints
|
Freeman Athletic Center
|
161 Cross St
|
Roseann Sillasen
|
August 2011
|
Photo Scope
|
|
Repair concrete walk on West side of Mt Vernon St Transition into house walk, stairs and driveways. Obtain approval from private house owners.
|
Mt Vernon St - west side
|
Mt Vernon St
|
Dave Hall / Roseann Sillasen
|
June 2011
|
Photo Scope
|
|
Gen Set Code Upgrade.
|
Exley Science Center
|
265 Church St
|
Mike Conte
|
TBD
|
Photo Scope
|
|
Investigate and seal exterior envelope of Hall Atwater. Address roof parapet.
|
Hall Atwater
|
265 Church St.
|
Rob Schmidt
|
TBD
|
|
|
Minor interior renovation, create new bedroom
|
Student WF
|
30 Fountain Ave
|
Roseann Sillasen
|
May 24, 2011
|
Photo Scope
|
CSS Morello
|
Minor interior renovation, create new bedroom Autocad drawings
|
Student WF
|
14 Fountain Ave
|
Roseann Sillasen
|
May 24, 2011
|
Photo
|
KBE Building Corp
|
Kitchen and bathroom renovation |
Student WF |
215 A Pine St |
Roseann Sillasen |
July 12, 2011 |
Photo / AutoCAD drawings/ Scope |
KBE Building Corp |
Bathroom renovation |
Student WF |
113 Cross St |
Roseann Sillasen |
July 12, 2011 |
Photo / AutoCAD drawing/ Scope |
Deferred |
Vinyl siding, window replacement, east side porch removal, new 1st floor landing and stair system, minor electrical |
Student WF |
122 Knowles Ave |
Roseann Sillasen |
July 12, 2011 |
Photo
Scope
|
KBE Building Corp |
New front entry porch and stair replacement |
Student WF |
4 Warren St |
Roseann Sillasen |
July 12, 2011 |
Photo Addendum #1
Scope Addendum #1
|
CSS Morello |
John Woods Memorial Tennis Courts 1-8 Renovation |
Freeman Athletic Center Tennis Courts |
Vine Street |
Roseann Sillasen / Jeff Sweet |
July 18, 2011 |
Scope Photo
Location
|
|
Roof Replacement / Fire Escape Removal |
Graduate |
22/24 Brainard |
Roseann Sillasen |
Proposal Form
July 18, 2011
|
Scope / Photos / TOC / Front End / Shingle Spec Roof Special |
|
Vinyl Siding Installation / New Windows / Porch Demolition & Deck Installation |
Graduate |
22/24 Brainard |
Roseann Sillasen |
July 18, 2011 |
Scope / Photos / TOC Front End |
|
Davison Art Library Entry Door Replacement |
Davison Art Center |
301 High St |
Roseann Sillasen |
July 18, 2011 |
Scope / Photos / TOC Front End |
|