Wesleyan University is committed to sustainability and environmental stewardship.  Emphasis has been placed on waste reduction, recycling, environmentally preferable purchasing, energy conservation and the use of materials that are either harvested through sustainable methods or made from recyclable materials.

Project Name / Description Building Name Building Address Managed by Work Schedule

Paint exterior of house and addition in toto. Perform carpentry repairs as identified.

Program House

Gingerbread House - 202 Washington St

Roseann Sillasen

May 24, 2010 - July 31, 2010

Demolish existing and construct new first floor front porch.  Paint west and southwest egress stair systems.   Install new windows on 1st and 2nd floor.

Student WF

261 Pine St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Paint exterior of house.  Paint all paintable surfaces. Perform carpentry repair.

Student WF

57 Fountain Ave

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Perform carpentry repairs to front porch, railings and wood siding as identified. Provide new porch stairs and footing. Provide Code compliant intermediate railing. Paint house and all paintable surfaces. Program House Asian / Asian American - 107 High St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Annual funds to replace failed boiler / furnaces

Student WF / Traditional Non-traditional Dorms / Program

Campus wide

Mike Conte

May 24, 2010 - July 31, 2010 

Annual funds to replace failed appliances.

Student WF / Traditional Non-traditional Dorms / Program

Campus wide

Mike Conte

May 24, 2010 - July 31, 2010 

Demolish and construct new east elevation 1st floor porch.  Replace windows; vinyl side exterior; paint areas of trim/porch windows as identified. Student WF 251 Pine St - 2 Family

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Replace windows and repair concrete header on second floor above windows on east elevation. Address interior window trim as required. Wrap exterior stops. Student WF 211 Pine St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Perform masonry repairs to east entry bluestone patio and all stairs from street level to upper level main entry.

PAC

238 Church St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

South Exit Doors: Replace doors, hardware, and weatherstripping.

Freeman Athletic Center-Bacon Field House

161 Cross St

Sean Higgins / Jeff Sweet / R Sillasen

May 24, 2010 - July 31, 2010 

Paint all paintable exterior surfaces. Perform carpentry repairs as noted and identified. Student WF 7 Fountain Ave

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Four sets Dbl. doors to lockers

Freeman Athletic Center-Hockey Area

161 Cross St

Sean Higgins / Jeff Sweet / R Sillasen

May 24, 2010 - July 31, 2010 

Butterfield A Lawn Ave

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Replace east exit doors (3) and hardware in Hockey area. Replace north double door to corridor and hardware, replace  door and hardware to women's entrance, replace door, frame and hardware to mechanical room.

Freeman Athletic Center-Hockey Area

161 Cross St

Sean Higgins / Jeff Sweet / R Sillasen

May 24, 2010 - July 31, 2010 

Replace southeast exit doors, frame, and hardware in Bacon Field House.

Freeman Athletic Center - Bacon Field House

161 Cross St

Sean Higgins / Jeff Sweet / R Sillasen

May 24, 2010 - July 31, 2010 

Provide metal roof repairs to stop leaks and paint large dome.

Van Vleck Observatory

11 Foss Hill Dr

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Remove all carpet in student rooms, refinish wood floors.

Student WF / Non-Traditional Dorm / Program House

Bayit - 157 Church St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Repair theatrical lighting system. Existing electrical cabling is very old. Insulation on conductors are dry, brittle and cracking. CFA P - Theater 283 Washington Terr

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Perform repairs to exterior concrete stairs.  Spalling from exposed rebar. Prep surfaces, treat rebar and coat surfaces with DiamondKote surface treatment. Install new handrails to be ADA compliant. CFA M - Zilkha 283 Washington Terr

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Existing 3 bed house requires interior renovation to address kitchen, bathroom, finishes, electrical and plumbing. Update fire alarm. Student WF 2 Warren St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Remove existing front and rear wood/glass doors and replace with new metal doors and frames. 

Student WF

2 Warren St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Perform repairs to exterior concrete stairs at north entrance.  Spalling from exposed rebar. Prep surfaces, treat rebar and coat surfaces with DiamondKote surface treatment. Install new handrails to be ADA compliant. CFA C - World Music 283 Washington Terr

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Annual contingency to address floor finishes in need of replacement in all student occupied housing.

Student WF, Non-Traditional Dorm / Program House

Campus wide

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Install emergency lighting in ceilings in penthouse, 7th, 6th and 5th floors of science center. 

Exley Science Center

265 Church St

Mike Conte

May 24, 2010 - July 31, 2010 

Exterior tree and landscape clearing around buildings and woodframes. Residential areas Campus Wide

Dave Hall  

May 24, 2010 - July 31, 2010 

Vine St Transformer Distribution 09/10-Replacement of electrical feeders to bring COGEN to Vine St Campus Wide Campus wide

Alan Rubacha

May 24, 2010 - July 31, 2010 

Install new security card access control system Non-Traditional Dorm 156 High St

Rob Schmidt

May 24, 2010 - July 31, 2010 

Existing interior stone stair treads in south stairtower  are worn. Infill worn treads with epoxy type material and cover with rubber dot non-slip stair treads and risers.

North College

237 High St

Roseann Sillasen / Tom Policki

May 24, 2010 - July 31, 2010 

Demo existing retaining wall in southwest section of yard on sidewalk side of house. Regrade, install new retaining wall.

Student WF

86 Lawn Ave

Roseann Sillasen

May 24, 2010 - July 31, 2010 

At main entrance on Cross Street, replace exterior doors, hardware, and swap vestibule and exterior; new hardware weatherstrip

Freeman Athletic Center

161 Cross St

Sean Higgins / Jeff Sweet / R Sillasen

May 24, 2010 - July 31, 2010 

Reno 3 bed house to create a 4th bedroom on the 2nd floor in existing kitchen. Demo 1st floor bathroom. Reno 2nd floor bathroom. Student WF 269 Pine Av

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Install code compliant speaker notification fire alarm devices in all areas, including stacks; add smoke detectors as necessary. Olin Library 252 Church St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Small dome is showing signs of age. Inspect metal roof, repair and necessary and paint.

Van Vleck Observatory

12 Foss Hill Dr

Roseann Sillasen

 May 24, 2010 - July 31, 2010

     

 

May 24, 2010 - July 31, 2010

Electrical/mechanical upgrades/repairs as identified. Rental Properties Campus wide

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Paint exterior. Repair wood soffits and wood details as identified.  Student WF 267 Court St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Upgrade existing elevator controllers of the two bank elevator in the north lobby. Exley Science Center 265 Church St

Mike Conte

May 24, 2010 - July 31, 2010 

Upgrade EMS controls. Remove and replace 9 pneumatic control valves serving FCU with electronic type. Provide automated logic ZN551 zone controller for each zone. Replace existing pneumatic t-stats with electronic sensors. Control 6 sections of perimeter radiation. Run new communication wiring and tie in to existing ARCnet 156K communication network. Furnish and install new VFD for pump PL1. Reinsulate pipes.

CFA L - Art Workshops 283 Washington Terr

Mark Chadsey

May 24, 2010 - July 31, 2010 

Replace windows and repair and paint front and rear porches. 3 units

Student WF

65 Pearl

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Reno kitchen, patch and paint interior, insulate, install new hardware, screen wood floors. Upgrade elect./ replace mech. systems. Reno 2nd floor full bathroom. Program House Earth House - 159 High

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Stain exterior, paint all paintable surfaces. Perform carpentry repairs. Student WF 15 Fountain Ave

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Inspect and repair/replace bridge panel motors.  Motors leak oil. CFA P - Theater 283 Washington Terr

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Perform repairs to existing wood siding, stain, waterproof. Remove, make watertight and reinstall windows on this elevation. Reflash coping on roof above this area. Freeman Athletic Center - Hockey Rink / Corridor areaway 161 Cross St

Jeff Sweet / Roseann Sillasen

May 24, 2010 - July 31, 2010 

Repair/patch EFIS.  Paint all paintable exterior surfaces including the EFIS surfaces. Initiate work at the northeast elevations. Soffits beginning to deteriorate. Freeman Athletic Center 161 Cross St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Create 2 new bedrooms by partitioning common rooms. 1st floor kitchen renovation. 2nd floor kitchen demo to study/library.  Demo 2nd floor shared wall between common room and hallway. Address electrical, sprinkler and fire alarm affected by new walls and demolished areas. Program House 65 Lawn - German Haus

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Reno existing 5 bedroom house. Review structural needs.  Address electrical/plumbing. Reuse fire alarm system/sprinkler. Student WF 134 Cross St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Clean existing siding. Install vinyl shutters on south elevation. Student WF 128 Church St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Replace concrete walk on West side of Mt Vernon St . Transition into house walkways, stairs and driveways.  Obtain approval from private home owners.

Mt Vernon St - west side Mt Vernon St

Roseann Sillasen / Dave Hall

May 24, 2010 - July 31, 2010 

Paint exterior.  Address exterior carpentry items.

Student WF

73 A&B Lawn Ave

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Clean duct work in facility. Butterfield A/B Lawn/Huber Ave

Mike Conte

May 24, 2010 - July 31, 2010 

Paint front and rear porches. Minor carpentry. Student WF 235 Pine St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Paint fire escape at north elevation. Paint east and west exterior doors and railings on lower levels.

Shanklin

237 Church St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Minor stucco repair northwest corner of house. Replace side porch with new stoop, railings and stair per code. Patch stucco and paint where enclosed porch was removed.  Install new basement door and trim back trees. Student WF 131 Cross St

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Renovate interior to create additional bedrooms. Address electrical/plumbing. Kitchen and bathroom renovations. New fire alarm/sprinkler system. New windows. Paint exterior paintable surfaces. Program House 44 Brainard Ave - Womanist House

Roseann Sillasen

May 24, 2010 - July 2, 2010 

Minor renovation to create new bedroom. Address electrical, fire alarm and sprinkler. Student WF 56 Fountain Ave

Roseann Sillasen

May 24, 2010 - July 31, 2010 

Carpentry repairs, gutter/leader replacement, exterior painting Program House 250 Court St Roseann Sillasen May 24, 2010 - July 31, 2010

 

ACAD=Academic    Admin=Administrative    Infra=Infrastructure    RP=Rental Properties    SLF=Student Life Facilities   SLF-WF=Student Life Facilities-Woodframes     ATH=Athletics