Major Maintenance FY 2010
Project Manager:  Roseann Sillasen
Work to be performed beginning Spring and Summer 2009

Click here to return to the Major Maintenance selection page

 

Click on hyperlinks below for additional information.

Wesleyan University is committed to sustainability and environmental stewardship.  Emphasis has been placed on waste reduction, recycling, environmentally preferable purchasing, energy conservation and the use of materials that are either harvested with sustainable methods or made from recyclable materials.

Building Name/Address
 Description
Managed by  Work Schedule 
North College - 237 High St Flat roof replacement Roseann Sillasen 5/27/2009 - 6/19/2009
Woodframes/Non Traditional & Traditional Dorms Annual allowance to paint interiors of student woodframes, program houses and dorms during summer maintenance Tom Policki 5/26/2009 - 8/30/2009
272-278 Court St Scrape, prep and paint all ext. surfaces including all windows, doors, soffits, columns and all trim. Perform masonry repairs. Trim trees. Roseann Sillasen 5/26/2009 - 8/30/2009
Neighborhood Pre-School - 20 Lawn Ave Replace roof Roseann Sillasen Summer 2009 - to be coordinated with building occupants
107 Cross St Replace kitchen floor, install new kitchen cabinets, repair walls, install new sink. Bathroom needs to be enlarged and updated. Roseann Sillasen 5/26/2009 - 8/1/2009
1 - 5 Vine Replace cement stairs and patio leading from Vine St to laundry- deteriorated Dave Hall 6/3/2009 - 7/15/2009
2 Warren Replace roof / paint exterior Roseann Sillasen 5/28/2009 - 6/10/2009
Freeman Athletic Center - 161 Cross St Replace 3 meter diving standards with new diving platform Jeff Sweet / Roseann Sillasen 8/1/2009 - 8/30/2009
CFA C - World Music - 283 Washington Terr Replace eroded stairs on north side of building Roseann Sillasen 6/3/2009 - 7/15/2009
283 Washington Terr Safety Item.  Inspect all rigging in Theater; prioritize, phase and execute repairs. Inspect and repair bridge panel motors.  Motors leak oil. Roseann Sillasen Summer 2009
43 Fountain Ave Porch roof replacement. Carpentry and stucco repairs. Exterior paint. Roseann Sillasen 5/26/2009 - 7/15/2009
28 Lawn Ave Replace windows. Perform soffit repair Roseann Sillasen 6/3/2009 - 7/15/2009
55 Brainard - 1st floor Replace front porch; failing.  Concrete work on walkway needed. Replace roof, gutters, chimney repointing.   Roseann Sillasen 6/3/2009 - 8/1/2009
Center For the Arts - 283 Washington Terr Install blue light phone in south courtyard next to CFA Music Studio Roseann Sillasen 5/26/2009 - 7/15/2009
Gingerbread House - 202 Washington St Reno 2nd floor bathroom. Roseann Sillasen Perform Summer 2009
Gingerbread House - 202 Washington St Roof replacement Roseann Sillasen 5/27/2009 - 6/12/2009
63 A&B Lawn Ave Roof replacement, new window installations Roseann Sillasen 6/1/2009 - 7/15/2009
48 Home Ave Fixed storm install on porch windows Roseann Sillasen 6/10/2009 - 7/3/2009
23 Vine St / 215 Pine St Basement hatchway replacement Roseann Sillasen 6/10/2009 - 7/15/2009
42 Miles Kitchen upgrade Roseann Sillasen 6/3/2009 - 7/31/2009
239 Pine St Replace front porches, ceilings and paint as required.  Roseann Sillasen 6/1/2009 - 8/1/2009
230 Washington St Remove hallway cabinet; provide additional shelving Roseann Sillasen 6/3/2009 - 6/30/2009
Undergrad Woodframes Install over range hood fans - various locations Roseann Sillasen 6/3/2009 - 7/31/2009
237 High Street Roof replacement Roseann Sillasen 5/27/2009 - 6/19/2009
Butterfield C - 50 Huber Ave Address rain run off from parking area at 51 Lawn Ave. Dave Hall 5/26/2009 - 6/15/2009
128 Church St Replace porch roof. Roseann Sillasen 5/27/2009 - 6/1/2009
10 Knowles Ave Install new windows; insulate attic Roseann Sillasen 6/15/2009 - 6/25/2009
CAMS - 255 High St Replace rubber roof over classroom Roseann Sillasen 6/1/2009 - 6/6/2009
Central Power Plant - 280 William St Install valves on feed-water piping to isolate boilers Peter Staye Summer 2009
Romance Languages - 300 High St Basement Minor bathroom upgrade Brandi Hood Summer 2009 - to be coordinated with occupants
CAAS - 343 High St Install trench drains in basement Roseann Sillasen Summer 2009 - to be coordinated with occupants
       
34 Fountain Ave Replace Kitchen floor. Install plywood subfloor. Roseann Sillasen Summer 2010
131 Cross St Paint house.  Repair side porch and install new steps per code.  Install new basement door and trim back trees. Roseann Sillasen Summer 2010
Butterfield A/B - Lawn/Huber Ave Clean all duct work in facility Mike Conte Summer 2010
Olin Library -s 252 Church St Install code compliant speaker notification appliances in all areas, including stacks; add smoke detectors as necessary. Barbara Spalding Summer 2010
Upward Bound - 41 Lawn Ave Paint exterior of entire building. Replace rear porch. Perform carpentry work to front porch. Replace front stairs and install new railings.  Roseann Sillasen Summer 2010
Freeman Athletic Center - 161 Cross St Remove existing wood siding, waterproof, install new wood siding, paint.  Roseann Sillasen Summer 2010
Campus wide Campus Landscape Plan - Hardscapes (Year 6 of 7) Roseann Sillasen Summer 2010
Asian / Asian American - 107 High St Paint House. Remove front porch stairs, replace the decking as required.  Replace railings, increase height per Code. Replace steps. Roseann Sillasen Summer 2010
146 Cross St Replace rotted wood siding. Prep and paint entire house. Roseann Sillasen Summer 2010
267 Court St Paint exterior. Repair wood soffits and wood details. Install new gutters and leaders. Roseann Sillasen Summer 2010
251 Pine St - 2 Family Replace windows; renovate porches, vinyl side exterior. Roseann Sillasen Summer 2010
Van Vleck Observatory - 11 Foss Hill Dr Replace roof on northwest side of building over computer area. Tom Policki / Roseann Sillasen Summer 2010
2 Warren St Existing 3 bed house requires total interior renovation.   Electrical/plumbing throughout to be replaced. Update fire alarm, lighting. Roseann Sillasen Summer 2010
161 Cross St Paint all paintable exterior surfaces including the Dryvit surfaces. Initiate work at  northeast elevations. Carpentry reparis at soffits Roseann Sillasen Summer 2010
235 Pine St Rebuild/Repair front porch, paint front and rear porches Roseann Sillasen Summer 2010
134 Cross St Reno existing 5 bedroom house. New electrical/ plumbing. Reuse fire alarm system. Roseann Sillasen Summer 2010
Foss Hill 8 - Foss Hill Dr Replace stone steps and railing with cast concrete.   Dave Hall   Summer 2010
CFA M - Zilkha - 283 Washington Terr Replace exterior concrete stairs. Roseann Sillasen Summer 2010
Cross St (Fountain to Warren) Replace sidewalk and provide brick apron between new walk and road similar to brick work at NE entrance to Freeman addition. Dave Hall / Roseann Sillasen Summer 2010
269 Pine Av Reno 3 bed house to a 4 bed house. Remove 2nd floor kitchen. Roseann Sillasen Summer 2010
Butterfield A - 20 Lawn Ave Install new fire alarm system; eliminate battery smoke detectors. Phased project. Barbara Spalding Summer 2010
7 Fountain Ave Paint Exterior. Replace porch and main roof. Roseann Sillasen Summer 2010
156 High St New security card access control system.  Roseann Sillasen Summer 2010
127 Cross St Repair stucco; paint exterior.  Replace gutters and aluminum soffit wrap.  Roseann Sillasen Summer 2010
German Hausa - 135 High St Renovate house Roseann Sillasen Summer 2010
Butterfield B - 20 Huber Ave Renovate the stone and asphalt dumpster area and install fencing.  Install pad for 8 yard dumpster and elongate curb cut. Dave Hall Summer 2010
CFA P - Theater - 283 Washington Terr Repair theatrical lighting system. Existing electrical cabling is very old. Roseann Sillasen Summer 2010
211 Pine St Replace windows and repair concrete header on second floor above windows on east elevation. Roseann Sillasen Summer 2010
264 Court Replace front side, rear porch, stairs, windows, roof, gutters. Paint exterior of house.  Roseann Sillasen Summer 2010

 

ACAD=Academic    Admin=Administrative    Infra=Infrastructure    RP=Rental Properties    SLF=Student Life Facilities   SLF-WF=Student Life Facilities-Woodframes     ATH=Athletics

CPP=Central Power Plant    AAF=Academic & Administrative Affairs    MH=Manhole    DDC=Direct Digital Controls    GFI=Ground Fault Interrupt 