Location |
Project |
Description |
Area |
CFA G -Art Studio South |
Fire Alarm |
Install Fire Alarm System |
AAF-Aca |
Science Tower |
AHU 1 Rebuild |
Replace all critical components introduce EMS |
AAF-Aca |
CFA L - Art Workshop |
Cabinetry |
Replace two section of cabinetry in print studio. Cabinetry used to store students art work. Continuation of work started in 01/02. |
AAF-Aca |
CFA P & R - Dance Studios & Theater |
Exterior Cleaning & repointing |
Clean/repoint exterior of buildings |
AAF-Aca |
CFA J - Cinema |
Fire Alarm |
Install fire alarm system in Cinema |
AAF-Aca |
CFA H -Art Studio North |
Fire Alarm |
Install fire alarm system throughout building. Continuation of project started in 01/02. |
AAF-Aca |
GLSP |
Roof replacement |
Replace roof over first floor, redirect gutters |
AAF-Aca |
Olin Library |
Elevator |
Modernize Elevator car |
AAF-Aca |
Olin Library |
Various Painting |
Paint entire 1st floor, reference area ceiling in vicinity of skylights, main stairway, 202a, and staff lounge. |
AAF-Aca |
Van Vleck Observatory |
Windows |
Replace all windows and provide window treatment, blinds etc. |
AAF-Aca |
Hall Atwater |
Carpet Room 254 Hall/ Atwater |
Replace carpeting in office. Existing is stained and worn. |
AAF-Aca |
Science Tower |
ST Lab new floor RM 103SC |
Replace existing carpet with VCT in SC103. |
AAF-Aca |
Olin Library |
Window Painting |
Paint exterior window frames and trim. |
AAF-Aca |
Van Vleck Observatory |
Paint Interior of Dome |
Scrape and paint interior walls of the large dome. |
AAF-Aca |
Olin Library |
Carpeting 202a and ramp |
Replace carpet in connector ramp between Olin and PAC. |
AAF-Aca |
Shanklin Lab |
Window Replacement |
Replace windows with operable, energy efficient windows to match existing elevation and profiles. |
AAF-Aca |
Science Tower |
Repair Dock Structure |
Make repairs to structural girders supporting deck over loading dock. |
AAF-Aca |
Physical Plant |
Tree Removal |
Remove large number of trees that are in terminal decline, and exhibiting signs of becoming dangerous. |
AAF-Aca |
Physical Plant |
Minor Maintenance |
Minor Maintenance Academic |
AAF-Aca |
South College |
Roof of Bell Tower |
Replace roof, repaint inside & out, add bird screen. Executive decision. |
AAF-Admin |
Public Safety |
Repave B Lot |
Repave B lot to address pot holes. Add two light fixtures to eliminate dense darkness at southeast end |
AAF-Admin |
President’s House |
Remove hemlocks, replant area |
Remove dying hemlocks and extend the hedge around the yard. Review this project with Rob Olson to ensure work to be performed is coordinated with the landscape master plan. |
AAF-Admin |
Physical Plant |
Minor Maintenance |
Minor Maintenance Administrative |
AAF-Admin |
Hockey Rink |
Rebuild Compressors |
Overhaul # 1 & #2 compressors in preparation for the 05/06 skating season. |
Athletics |
Freeman Athletic Center |
Repair intrusion of ground water |
Excavate the West side of the main foyer to repair intrusion of ground water through the block walls. |
Athletics |
Freeman Athletic Center |
Repair Tennis courts 1 - 8 |
Clean west end of courts 4 & 8 and the north end of courts 5 - 8. Patch north end of courts 5 -8. Paint court 8 plus courts 5 - 8. |
Athletics |
Freeman Athletic Center |
Paint ground floor hallway. |
Paint ground floor hallway to match color scheme of new addition. |
Athletics |
Freeman Athletic Center |
Replace ground floor hallway flooring |
Remove VCT flooring and replace with VCT or other recommended floor materials. |
Athletics |
Freeman Athletic Center |
Athletic fields |
Renovate fields |
Athletics |
Freeman Athletic Center |
Clean drain ditch |
Clean out silt in drain ditch or install drain pipe on the south end of the field. |
Athletics |
William Street High Rise |
Minor Maintenance |
Minor Maintenance SLF |
Athletics |
Physical Plant |
CHEFA |
CHEFA Debt Service |
CAMPUS |
Physical Plant |
CPP |
GE Debt Service |
CAMPUS |
Physical Plant |
Signage |
Campus-wide Signage Improvements |
CAMPUS |
Physical Plant |
Receptacles |
Campus-wide Trash Receptacles |
CAMPUS |
Physical Plant |
Landscape |
Campus Landscape Plan (Year 2 of 7) |
CAMPUS |
Physical Plant |
Lighting |
Campus Exterior Lighting Plan (Year 2 of 10) |
CAMPUS |
Physical Plant |
Infrastructure |
Emergency Infrastructure (power/water/sewer/storm) |
CAMPUS |
Physical Plant |
Roofing |
Emergency Roofing |
CAMPUS |
Physical Plant |
Contingency |
Emergency Contingency |
CAMPUS |
Physical Plant |
Hazardous Materials |
Asbestos & Lead Abatement |
CAMPUS |
Physical Plant |
Manhole East of Foss 10 |
Rebuild manhole complete (steam only) |
Infra |
CPP |
Replace Roof |
Replace Roof |
Infra |
Graduate |
71 Lawn Avenue |
Paint exterior of house. Repair rear porch. |
RP |
Faculty |
47 Brainard Avenue |
Paint exterior of house. |
RP |
Faculty |
82 Lawn Avenue |
Replace siding. Paint exterior of house |
RP |
Graduate |
32 Brainard Avenue |
Replace oil boiler. |
RP |
Faculty |
158 Mt Vernon |
Replace carport |
RP |
Undergraduate |
39 Brainerd Avenue |
Replace front porch, paint house trim. |
RP |
Graduate |
36 Brainard Avenue |
Paint trim on house. |
RP |
Graduate |
40 Home Avenue |
Demo garage. Repair roof & chimney. |
RP |
Physical Plant |
Rental Properties trees |
Remove dead and dying trees, as we have on the campus. |
RP |
Graduate |
79 Lawn Avenue |
Replace front porch and paint. Replace porch roof. Install new gutters and leaders with cleanouts. Paint entire house |
RP |
Faculty |
55 Lawn Avenue |
Replace front porch and paint. Replace entire roof including porch. Install new gutters and leaders with cleanouts. Paint exterior. |
RP |
Undergraduate |
132 Pearl Street |
Paint exterior of house. |
RP |
Faculty |
41/43 Brainard Avenue |
Replace front porch and paint. Paint exterior of house. Replace porch roof and gutters. |
RP |
Faculty |
5 Huber Manor |
Replace oil boiler. |
RP |
Physical Plant |
Operations |
Woodframe Rental Properties Operations |
RP |
William Street B Low rise |
Replace hedge |
Remove overgrown hedge and replace it with a new hedge or combination of fence and hedge.Coordinate this work with Rob Olson Landscape Plan and construction plans for Low Rise Complex. |
SLF |
Physical Plant |
Tree Trimming |
Clear branches from buildings, including wood frames. Close proximity encourages mold and rot of roofs. |
SLF |
Foss Hill Dorm # 4 |
Rebuild drip line |
Rebuild area under balconies, add stone to enhance drainage. Include area around Foss 1. |
SLF |
Butterfield C |
Repair stone |
Bluestone in this complex needs constant care. |
SLF |
Physical Plant |
Appliance replacement allowance |
Replace kitchen appliances on a 7 year cycle |
SLF |
Butterfield A |
Butterfield A& B |
Controls Upgrade |
SLF |
Butterfield A |
Butterfield A& B |
Abatement |
SLF |
Physical Plant |
Carpet replacement |
Annual allowance to replace carpeting throughout residential facilities based on 5 year replacement schedule |
SLF |
Foss Hill Dorm # 1 |
Exterior Painting |
Scrape and paint all painted surfaces on units 1 - 7. Replace masonry caulking on all balcony's and around all window surfaces. |
SLF |
William Street Highrise |
Exterior Renovations |
Re-point all masonry joints, repair deteriorating concrete at each slab level , replace caulking around all windows and wash the exterior/interior of all windows |
SLF |
Foss Hill Dorm # 1 |
Replace condensate pumps and tanks |
Replace condensate tanks and pumps in unit 1 and unit 4 mechanical rooms with steam driven units. |
SLF |
William Street B Lowrise |
Replace roof |
The roof is over 30 years old and is leaking in many areas. Scope and cost developed during bookstore renovations but not funded. Deferred |
SLF |
William Street Low Rise B |
Convert 10 bed units to 4 bed units |
Convert 3 (10) bed apartments to (6) 4 bed apartments. Work to include wall demolition, abatement of existing common room floor material and 2 bedrooms on first floor, 3 new kitchens, carpentry, doors and hardware for new private 2nd floor bedrooms, carpet in new living room. Install second means of egress. |
SLF |
200 High Street |
Renovate 2 public bathrooms |
Replace flooring, lighting, partitions, sinks and toilets. Replace main entrance door and paint room. |
SLF |
200 High Street |
Renovate kitchen |
Replace flooring, lighting, countertops and plumbing. Remove industrial kitchen hood, replace gas appliances with residential electric units. Upgrade food storage units. Paint entire area. |
SLF |
200 Church Street |
Interior Finishes |
Paint, refinish floors throughout, install standard freshman kitchen similar to Clark Hall, perform required repairs to bathrooms. |
SLF |
William Street High Rise |
Minor Maintenance |
Minor Maintenance SLF |
SLF |
Foss Hill Dorm # 1 |
Exterior Cleaning |
Exterior Cleaning of Foss 1 - 7 |
SLF |
William Street Low rise A |
Lowrise A Renovation |
Install sprinkler, fire alarm, new kitchens and bathrooms in existing units, flooring, paint, new windows. Abatement. Convert (4) 10 bedroom units to (8) 4 bedroom units. Provide new kitchens in converted units. |
SLF |
William Street C Low rise |
Lowrise C Renovation |
Install sprinkler, fire alarm, new kitchens and bathrooms in existing units, flooring, paint, new windows. Abatement. Convert (1) 10 bedroom units to (2) 4 bedroom units. Provide new kitchen in converted unit. |
SLF |
William Street D Low rise |
Lowrise D Renovation |
Install sprinkler, fire alarm, new kitchens and bathrooms, flooring, paint, new windows. Abatement. |
SLF |
William Street E Low rise |
Lowrise E FS, FA, and furniture |
Install sprinkler, fire alarm, interior patch and paint. |
SLF |
Foss Hill 1-4 |
Westco Lounge/Laundry |
Address finishes, provide kitchenette, electrical, flooring, Abate as required. |
SLF |
Foss Hill 1-4 |
Westco Café |
Address finishes, remove existing kitchen and bar, provide electrical and lighting, clean and refinish flooring, Abate as required. |
SLF |
Physical Plant |
Wood frame trees |
Remove dead and dying trees, as we have on the campus. |
SLF-WF |
Student Housing |
65-A,B+C Renovation |
Renovate Bathrooms & Kitchens |
SLF-WF |
Appliance replacement |
Appliance replacement |
Appliance replacement allowance |
SLF-WF |
Student Housing |
Electrical upgrade @ 65 Pearl St. |
Install new lighting and switches at unit A,B & C. |
SLF-WF |
William Street High Rise |
Insulate Attics |
Insulate Attics (at houses located on Cross Street) |
SLF-WF |
Student Housing |
Lights & GFI`S @ 324 Washington St. |
Install new lighting and switches. Install GFIS in Kitchens and Bathrooms. |
SLF-WF |
New Furnaces |
New Furnaces |
Replace old furnaces in 7-8 houses (Year 1 of 10 year program) |
SLF-WF |
New windows |
New windows |
Replace old windows( windows on houses at Cross St. (Year 1 of 7) |
SLF-WF |
Student Housing |
Renovate kitchen @ 52 Home Ave |
Renovate kitchen including plumbing, and electrical |
SLF-WF |
Student Housing |
Repair Porch @ 52 Home Avenue |
Renovate to code |
SLF-WF |
Student Housing |
Repair Porch @ 54 Home Avenue |
Renovate to code |
SLF-WF |
Student Housing |
Repair Porch 63 A+B Home |
Renovate to code |
SLF-WF |
Student Housing |
Repair Porch and paint house @ 14 Fountain |
Renovate to code and paint house |
SLF-WF |
Student Housing |
Roof Repair @ 84 Home Ave |
Roof Repair |
SLF-WF |
Sr. Woodframe |
77 Home Renovation |
Install sprinkler, fire alarm, kitchens, bathrooms, interior plaster patch, insulate attic, new windows, siding, electrical and mechanical work. |
SLF-WF |
Sr. Woodframe |
5 Vine Street Renovation |
Install sprinkler, fire alarm, new bathrooms and kitchen, plaster, paint interior, exterior siding, new windows, insulate attic, electrical and mechanical work. |
SLF-WF |
Sr. Woodframe |
12 Warren Street Renovation |
Install sprinkler, fire alarm, renov bathrooms and kitchen, plaster, paint interior, exterior siding, new windows, insulate attic, electrical and mechanical work. |
SLF-WF |
Low Rise Complex |
Low Rise Landscape |
Address a portion of the Rob Olson Landscape Plan for the Low Rise complex. Remove hedge from William Street and replace with 4 trees. Coordinate type of trees with City of Middletown, Jennifer StPitch. Replace ashphalt areas where excavated for new water mains with grass cover and plantings. |
SLF |