Pr #
|
Building
|
Project Name
|
Maintenance
|
Seg
|
1
|
Student Housing
|
Wood frame Houses-various
|
Install GFI to code in houses where needed
|
SLF-W
|
2
|
Physical Plant
|
CPP
|
Replace #2 boiler's soot blower (generating bank) with a unit from Diamond.
|
Infra
|
3
|
Student Housing
|
76 Lawn Ave.
|
Repair/replace front steps install rails to code
|
SLF-W
|
4
|
Student Housing
|
Wood frame Houses-various
|
Emergency Sewer Repairs
|
SLF-W
|
5
|
Physical Plant
|
Remove 5 tanks
|
A committed on-going project to pull all underground tanks
|
Infra
|
6
|
North College
|
237 High St.
|
Complete replacement of fan coil units on 1st and 2nd floor.
|
Admin
|
7
|
Foss Hill Dorm # 4
|
Replace sewer lines
|
Replace old clay sewer lines from Foss 4 to Foss Drive manhole.
|
SLF-D
|
8
|
Substation
|
Recabling
|
High voltage feeder from sub station to Butterfield needs replacement
|
Infra
|
9
|
CPP
|
CPP
|
Replace 4 steam isolation valves on steam line feeding the campus.
|
Infra
|
10
|
CPP
|
CPP
|
Clean Firesides & watersides on #1 & #2 boilers.
|
Infra
|
11
|
South College
|
229 High St.
|
Renovate existing single occupancy unisex ground floor bathroom and bring into ADA compliance.
|
Admin
|
12
|
Butterfield A
|
25 Lawn Ave.
|
Replace high voltage cabling between complexes.
|
SLF-D
|
13
|
Student Housing
|
44 Home Ave.
|
Replace roofing
|
SLF-W
|
14
|
Rental Properties
|
3 Brainerd Ave.
|
Replace oil boiler
|
RP
|
15
|
Foss Hill Dorm # 1
|
Transformers
|
Replace 4160 to 208 step down transformers at Foss 1, 4 and 5
|
SLF-D
|
16
|
CFA M - Zilkha Gallery
|
283 Washington Terrace
|
Install Fire Alarm system
|
Acad
|
18
|
CPP
|
CPP
|
Repair stacks
|
Infra
|
19
|
Student Housing
|
24 Fountain Ave.
|
Repair porches per code. Paint porch..
|
SLF-W
|
20
|
Student Housing
|
48 Home Ave.
|
Repair porches per code. Paint entire house.
|
SLF-W
|
21
|
Student Housing
|
184 Washington ST.A+B
|
Upgrade electrical system to code. Renovate kitchen in unit 1A
|
SLF-W
|
22
|
CFA P - Theater
|
283 Washington Terrace
|
Existing theater lighting (qty-69) contains asbestos in the lamps and cords. Replace with current standard energy efficient instruments.
|
Acad
|
23
|
Judd Hall
|
207 High St.
|
Front brownstone steps need to be reset. Column may be cracked, front brownstone entrance requires structure re work
|
Acad
|
24
|
CFA - Crowell Concert
|
283 Washington Terrace
|
Install Fire Alarm
|
Acad
|
25
|
CPP
|
CPP
|
Install evaporative cooling to reduce temperatures in interior of space - required for personal safety and to protect electronic equipment- Cost of this work to be combined with CHEFA Chiller Project.
|
Infra
|
26
|
Science Tower
|
265 Church St.
|
Install metering on primary electric system
|
Acad
|
27
|
Student Housing
|
240 Court Roof
|
Replace roof. Field observation by roofing contractor.
|
SLF-W
|
28
|
Student Housing
|
Wood frame Houses-various
|
Upgrade interior lighting to code, and add wall switches in rooms where needed.
|
SLF-W
|
29
|
Student Housing
|
Wood frame Houses
|
Appliance replacement-various locations
|
SLF-W
|
30
|
English Department
|
279 Court St.
|
Lights flicker, inspect wiring and repair.-To be perform in-house, split load.
|
Admin
|
31
|
Judd Hall
|
207 High St.
|
Replace dysfunctional fume hood on 4th floor
|
Acad
|
32
|
CFA L - Art Workshop
|
283 Washington Terrace
|
Install Fire Alarm
|
Acad
|
33
|
CFA P - Theater
|
283 Washington Terrace
|
Repair theater rigging per inspection report
|
Acad
|
34
|
CPP
|
Boiler Repairs
|
#2 Boiler- remove outer casing and insulation to inspect for leaks. Repair any leaks found.
|
Infra
|
35
|
Student Housing
|
151 Church St.
|
Install sprinkler system and upgrade alarm system if necessary.
|
SLF-D
|
36
|
Foss Hill Dorm # 7
|
Hot Water Tank
|
Replace hot water tank. Abatement is necessary.
|
SLF-D
|
37
|
Rental Properties
|
Various Locations
|
New service is needed to replace old fuse panels and GFI's need to be installed for code issues.
|
RP
|
38
|
Rental Properties
|
Replace city sidewalk from 82 Lawn Ave to Pine St.
|
Remove dangerous walk, and pour a new concrete walk. Remove dead city trees.
|
RP
|
39
|
President’s House
|
Replace sidewalk at High St.
|
Replace the uneven and broken stone with a tinted concrete for safety and maintenance. High St. walk
|
Admin
|
41
|
Women’s Studies
|
287 High St.
|
Install emergency lighting in stairwells, exit signs, replace gutters & downspouts, scrape& paint building, shutters, doors, install window in basement, remove unused weatherhead and conduit, install fire alarm system and smokeheads. Asbestos abatement.
|
Admin
|
43
|
CAAS
|
343 High St.
|
Repair and paint exterior of building (old section only-front). Upgrade electrical.
|
SLF
|
44
|
Russell House / Honors
|
359 High St.
|
Upgrade electrical to extension portion of Russell House to allow use of PCs and a/c concurrently.
|
Admin
|
45
|
CFA Zilkha Gallery
|
283 Washington Terrace
|
Replace hydraulic cylinder
|
Admin
|
46
|
Student Housing
|
200 High St.
|
Install sprinkler system and upgrade alarm system if necessary.
|
SLF-D
|
47
|
Student Housing
|
162 Church St -1st floor
|
Renovate bathroom including plumbing and electrical
|
SLF-W
|
48
|
Student Housing
|
44 Home Ave 2nd fl.
|
Renovate bathroom including plumbing and electrical
|
SLF-W
|
50
|
Physical Plant
|
Remove hemlocks around campus.
|
Second half of a phased project to remove all of the dead and dying trees.
|
Infra
|
51
|
Freeman Athletic Center
|
161 Cross St.
|
Repair brick accent walls, repoint. Repair walls by chemical room entrance.
|
SLF-A
|
52
|
North College
|
237 High St.
|
Complete insulation of chilled water lines in basement.
|
Admin
|
53
|
Davison Art Center
|
301 High St.
|
Vault safety improvements. Install containment below pipes in vault
|
Admin
|
54
|
CPP
|
CPP
|
Insulation of lines in man way #9 ( William St./Hamlin St.)
|
Infra
|
55
|
CPP
|
CPP
|
Clean #1 & #2 Fuel Oil Tanks.
|
Infra
|
56
|
CFA F - Music Studios
|
283 Washington Terrace
|
Construct steel access system from upper level of stair tower to roof hatch to provide roof access.
|
Acad
|
57
|
Hall Atwater/Shanklin Lab
|
Electric Metering
|
Add Electric Metering to Building
|
Acad
|
58
|
Student Housing
|
49 Home Ave.
|
Repair porches to code. Paint house. Includes body, trim, windows, doors, porches, decks, enclosed porches, basement doors/hatchways. Paint foundation if previously painted. Colors to be provided by Owner.
|
SLF-W
|
59
|
Student Housing
|
73 Home Ave.
|
Repair porches per code. Paint entire house.
|
SLF-W
|
61
|
Student Housing
|
4 Warren St.
|
Repair porch per code, Paint
|
SLF-W
|
62
|
Student Housing
|
19 Fountain Ave.
|
Replace old roofing
|
SLF-W
|
63
|
Student Housing
|
30 Fountain Ave.
|
Replace old roofing
|
SLF-W
|
64
|
PAC/Harriman Hall
|
238 Church St.
|
Basement toilets overflow in heavy rainstorms. Check for underground broken sewer line, etc.-Performed by in-house
|
Acad
|
65
|
Rental Properties
|
329 Washington Terrace-Guest House
|
Replace electrical in entire guest house.
|
RP
|
66
|
Rental Properties
|
260 Pine St.
|
Replace sewer lines.
|
RP
|
67
|
Rental Properties
|
171 Mount Vernon
|
Replace sewer lines.
|
RP
|
68
|
Physical Plant
|
Catch Basins at High-rise and Foss Hill Dr.
|
Repair catch basins- materials are rotting, allowing the top to drop below the surface.
|
SLF-D
|
69
|
South College
|
229 High St.
|
Clean and repoint stone at entrance to South College
|
Admin
|
70
|
CFA C - World Music
|
283 Washington Terrace
|
Repair roof pitch between skylights to eliminate leaks. Repair skylight gaskets and seams.
|
Acad
|
71
|
Freeman Athletic Center
|
161 Cross St.
|
Refurbish steeplechase pit to updated safety specifications
|
SLF-A
|
72
|
CPP
|
CPP
|
Install feed water pre-heater
|
Infra
|
73
|
CPP
|
Campus Wide
|
Rebuild steam and chilled water manhole in front of north college (MH #2). Install new steam pump.
|
Infra
|
74
|
Student Housing
|
55 Home Ave.
|
Repair porches per code. Paint house. Includes body, trim, windows, doors, porches, decks, enclosed porches, basement doors/hatchways. Paint foundation if previously painted. Colors to be provided by Owner.
|
SLF-W
|
75
|
Student Housing
|
72 Home Ave.
|
Repair porches to code. Paint entire house.
|
SLF-W
|
76
|
Student Housing
|
28 Lawn Ave.
|
Repair porches per code. Includes but not limited to decking, ceiling, rails, steps, columns. Paint house. Includes body, trim, windows, doors, porches, decks, enclosed porches, basement doors/hatchways. Paint foundation if previously painted. Colors to be provided by Owner.
|
SLF-W
|
77
|
PIMMS
|
178 Cross St.
|
(Install fire alarm system, smoke detectors (to be performed during winter break)), upgrade electrical, repair conference room wall and repair roof where water is entering room.
|
Admin
|
78
|
Science Tower
|
265 Church St.
|
Add DDC controls to hallway lights for use of load shedding.
|
Acad
|
79
|
Student Housing
|
186 Cross St.
|
Renovate bathroom including plumbing and electrical
|
SLF-W
|
81
|
Student Housing
|
267 Court ST. A,B,C
|
Replace old roof. Renovate kitchen in unit #A. including plumbing and electrical
|
SLF-W
|
83
|
Rental Properties
|
160 Lincoln Street
|
Replace boiler. (Oil)
|
RP
|
84
|
Rental Properties
|
130 Mount Vernon
|
Replace boiler. (Oil)
|
RP
|
85
|
Downey House
|
Replace walk along High St.
|
The uneven stones should be replaced with a tinted concrete to provide a stable surface for all of the traffic to and thru this area.-To be performed by R. Schmidt w/ Humanities Villiage
|
Admin
|
86
|
Freeman Athletic Center
|
161 Cross St.
|
Continue the program of upgrading a field each year, to upgrade the use, safety and integrity of the sports surfaces and greenscape of the campus.
|
SLF-A
|
87
|
Freeman Athletic Center
|
161 Cross St.
|
Repair broken bricks, point to keep from freeze/thaw at semi-circle drive.
|
SLF-A
|
88
|
Freeman Athletic Center
|
161 Cross St.
|
Rebuild drainage area at chemical room entrance. Berm or install drain across walk, trench to area drain.
|
SLF-A
|
89
|
CFA M - Zilkha Gallery
|
283 Washington Terrace
|
Repair/pave walk and stairs from "T" lot, replace railing
|
Acad
|
90
|
CFA P - Theater
|
283 Washington Terrace
|
Examine existing construction of mezzanine above costume shop for code compliance and safety.
|
Acad
|
91
|
Wesleyan Press
|
110 Mt. Vernon
|
Replace electrical service and recircuit building, upgrade heating system, Review heating system, if cost <$3,000, perform work. Allowance for scope
|
Admin
|
92
|
Rental Properties
|
80 Lawn Avenue
|
Replace roof.-Moved above line by consensus
|
RP
|
93
|
Student Housing
|
24 Fountain Ave
|
Renovate bathroom including plumbing and electrical-
|
SLF-W
|
94
|
Student Housing
|
Wood frame Houses-various
|
Provide and install lock system for the bedrooms of all wood frame houses.-Moved above line by consensus. Initiate master key system on rooms that currently have no lock.
|
SLF-W
|
95
|
PAC/Harriman Hall
|
238 Church St.
|
Replace floor coverings and make floor system watertight - install floor drains at 2nd floor restrooms-Moved above line by consensus due to current need
|
Acad
|
96
|
Romance Languages
|
300 High St.
|
Replace slate roof, including all flashings and skylight over stairway-Moved above line through reduction of contingency dollars.
|
Admin
|
97
|
Park Washington
|
256 Washington St.
|
Replace hydraulic cylinder-Per HK, to be paid by Park Washington
|
SLF-W
|
98
|
Student Housing
|
211A Pine St.
|
Renovate bathroom. Linoleum floor peeling, painted wallpaper peeling, paint chips in tub. Ensure GFI.
|
SLF-W
|
100
|
Student Housing
|
135 High 2nd fl.
|
Renovate bathroom to code including plumbing and electrical
|
SLF-W
|
101
|
Student Housing
|
44 Home Ave
|
Repair or remove back porch
|
SLF-W
|
102
|
Malcolm X House
|
343 Washington St.
|
Install sprinkler system in residential area of facility. Upgrade fire alarm system. Replace lounge floor, abatement required.
|
SLF-D
|
103
|
Student Housing
|
211A Pine St.
|
Renovate kitchen including plumbing and electrical
|
SLF-W
|
104
|
Rental Properties
|
71 Lawn Ave.
|
Replace roof.
|
RP
|
105
|
Rental Properties
|
1 Long Lane
|
Replace sewer lines.
|
RP
|
106
|
Rental Properties
|
15 High Street
|
Replace sewer lines.
|
RP
|
107
|
Rental Properties
|
15 High Street
|
Replace boiler. (Oil)
|
RP
|
108
|
Physical Plant
|
Level sidewalks
|
Hydro level sunken areas of concrete walk to the level of the rest of the walk.
|
Infra
|
109
|
Science Tower
|
265 Church St.
|
Concrete in areaway is delaminating and deteriorating, especially on structural beams. Engineering and suggested remedial work will be performed. Soil Borings performed. Redesign to be obtained.
|
Acad
|
110
|
Davison Art Center
|
301 High St.
|
Replace antique and dysfunctional A/C equip and install EMS
|
Admin
|
111
|
CFA P - Theater
|
283 Washington Terrace
|
Replace rotted exit doors and frames in stair towers. Ensure proper reconnection of Safe & Sound alarm system.
|
Acad
|
112
|
CFA P - Theater
|
283 Washington Terrace
|
Balance HVAC system, clean coils repair/replace dampers, install DX cooling in control booth
|
Acad
|
113
|
Judd Hall
|
207 High St.
|
Replace pneumatic controls on air handlers 2,3,4,5,6 and heating converters north and south. These control the radiation in rooms 113, 116and Library also need to included. DDC upgrade A/Cs
|
Acad
|
114
|
Student Housing
|
22 Lawn Paint House
|
Paint house. Includes body, trim, windows, doors, porches, decks, enclosed porches, basement doors/hatchways. Paint foundation if previously painted. Colors to be provided by Owner.
|
SLF-W
|
115
|
Student Housing
|
Fountain Ave Sidewalk
|
Repair concrete sidewalk. Broken and raised.
|
SLF-W
|
116
|
In Town
|
Units 1 - 5
|
Paint interior, roof repair.
|
SLF-D
|
117
|
Student Housing
|
168 Cross St
|
Renovate bathroom including plumbing and electrical
|
SLF-W
|
118
|
Student Housing
|
171 Vine St A+B
|
Renovate bathroom including plumbing and electrical
|
SLF-W
|
119
|
Student Housing
|
207-A+B Pine St.
|
Repair kitchens in both units including plumbing and electrical
|
SLF-W
|
121
|
Rental Properties
|
36 Mansfield Terrace
|
Replace gas boiler.
|
RP
|
122
|
Rental Properties
|
27 Brainerd Avenue
|
Replace boiler. (Oil)
|
RP
|
125
|
Foss Hill Dorm # 1
|
Fused cut-out
|
Replace existing oil fused cut-outs
|
SLF-D
|
126
|
Freeman Athletic Center
|
161 Cross St.
|
Inspect and repair grout on the main deck area of Natatorium.
|
SLF-A
|
127
|
Univ. Relations & Dev.
|
318 High Street
|
Front of foundation wall concrete façade finish over is cracked off on corner and front face is showing signs of cracking also.
|
SLF-W
|
128
|
CFA M - Zilkha Gallery
|
283 Washington Terrace
|
Per architect's recommendations, this is phase 1 of a multi-year project for Gallery renovations.
|
Admin
|
129
|
Physical Plant
|
56 Hamlin Street
|
Complete replacement of double hung windows started in 02/03
|
Infra
|
130
|
CPP
|
CPP
|
New Draft control unit for the Cleaver Brooks boiler #3.
|
Infra
|
131
|
Guest House
|
327 High St.
|
Rebuild entrance elevation to prevent ponding water and provide proper drainage.
|
Admin
|
133
|
Student Housing
|
76 Lawn Paint House
|
Paint house. Includes body, trim, windows, doors, porches, decks, enclosed porches, basement doors/hatchways. Paint foundation if previously painted. Colors to be provided by Owner.
|
SLF-W
|
134
|
William Street High Rise
|
William St.
|
Modernize control system and doors
|
SLF-D
|
166
|
Student Housing
|
CAMPUS - Trash Cans
|
Install 30 trash cans at strategic locations throughout campus (Coordinate type with Campus Master Plan) In Progress
|
SLF-W
|
187
|
Freeman Athletic Center
|
161 Cross St.
|
Replace the divider curtain system in Bacon Field House with mechanical system.
|
SLF-A
|
203
|
Olin Library
|
252 Church St.
|
Install new light posts on Church Street & Clark Hall elevations to better illuminate the stairways and drives. (Coordinate type with Campus Master Plan)
|
Acad
|
258
|
Science Tower
|
265 Church St.
|
Rekey Science Center including library, excluding Hall Atwater & Shanklin
|
Acad
|
259
|
Olin Library
|
252 Church St.
|
Replace curtains in Smith Reading Room, 20 years old
|
Acad
|
271
|
Olin Library
|
252 Church St.
|
Replace flooring in connector between Olin and PAC
|
Acad
|
291
|
Anthropology Dept.
|
281 High St.
|
Replace vinyl stair treads on front foyer stairs. Remove chalkboard from Prof. Sharma's office, paint wall.
|
Acad
|