Major Maintenance FY 2002/2003

Approved Priority Item List

December 7, 2001 - Revised December 10, 2001

Click here to see other active projects on campus that are not Major Maintenance

Click here to see Major Maintenance FY 2003/2004 approved priority items.

or

Click here to return to the Major Maintenance selection page

Shaded areas indicate project completed.

 

Item Priority #

Building Address

Building Name/Tenant

Proposed Maintenance

Segment

1

Various

Campus

Removal of 5 underground oil storage tanks, CHEFA required - COMPLETE

Infrastructure

2

Washington Terr

CFA Complex

Install fire alarm system - COMPLETE

A&AF

3

159 High St

159 High St

Add fire sprinkler system, door closers, extend handrails. Approx. cost

RP

4

22/24 - 36 Brainerd Ave

22/24 - 36 Brainerd

Replace doors/frames with fire rated. Extend handrails to be code compliant. Fire protection in basements. Fire Dept. mandate. Approx. Cost

RP

5

200 Church St

Chi Psi

Upgrade Electrical System - COMPLETE

SLF

6

280 William St

CPP

Roof repairs to address active leaks - COMPLETE

A&AF

7

327 High St

Infirmary & Guest House

Replace doors per fire Marshall

A&AF

8

200 Church St

Chi Psi

Install Sprinkler System - COMPLETE

SLF

9

Various

Grad/Fac/Staff properties

Asbestos Abatement

RP

10

272-278 Court St

Wes Court Apts

Paint all windows and trim 

RP

11

All Houses

All Houses

Secure Basements & Attics - COMPLETE

SLF-WF

13

200 Church St

Chi Psi

Replace Bedroom Doors & Locksets - COMPLETE

SLF

14

280 William St

CPP

Improve ventilation, provide cooling within space - COMPLETE

A&AF

15

200 High St

Eclectic

Replace Bedroom Doors & Locksets - COMPLETE

SLF

16

134 Cross St

134 Cross St

New Roof & Gutter, Paint House - COMPLETE

SLF-WF

17

159 Vine St

159 Vine St

Repair Back Porch, Upgrade Smoke Detectors to Code, Paint House - COMPLETE

SLF-WF

18

163 Vine St

163 Vine St

Repoint Chimney, Upgrade Smoke Detectors to Code, Paint House - COMPLETE

SLF-WF

19

166 Cross St

166 Cross St

New Roof, Paint House, Upgrade Interior Lights, Pave Driveway, Repair Stucco - COMPLETE

SLF-WF

20

188 Cross St

188 Cross St

Paint House, Repair Porch And Roof, Repair Front Steps, Install Gutters Around House - COMPLETE

SLF-WF

21

343 Washington Terr

East Asian Studies

Install fire alarm system - COMPLETE

A&AF

22

271 Court St

English

Install fire alarm system - COMPLETE

A&AF

23

212 College St

Human Resources

Install fire alarm system - COMPLETE

A&AF

24

207 High St

Judd Hall

Install fire alarm system / Work to begin December 15, 2002

A&AF

25

237 High St

North College

Install fire alarm system / Elevator Recall - COMPLETE

A&AF

26

300 High St

Romance Languages

Install fire alarm system - COMPLETE

A&AF

27

318/330 High St

University Relations

Repair/replace walks at 318/pave worn corner of drive at 330 - COMPLETE

A&AF

29

167 Vine St

167 Vine St

Powerwash and Repoint Brick, Repair Porch, Install New Interior Lights, Remove Vines From House, Upgrade Smoke Detectors to Code - COMPLETE

SLF-WF

30

171 Vine St

171 Vine St

Paint House, New Interior Lights, Upgrade Smoke Detectors to Code - COMPLETE

SLF-WF

31

23 Vine St

23 Vine St

Wash or Spray Paint Exterior, Upgrade Smoke Detectors to Code - COMPLETE

SLF-WF

32

54 Home Ave

54 Home Ave

Paint House, New Roof, Repair Porch - COMPLETE

SLF-WF

33

7 Vine St

7 Vine St

Paint House, Repair Exterior Steps, Upgrade Interior Lighting, Remove Shrubs Around Bldg, Upgrade Driveway - COMPLETE

SLF-WF

34

9 Vine St

9 Vine St

Upgrade Interior Lights, Paint House, Upgrade Landscape, Remove Shrubs - COMPLETE

SLF-WF

35

Church/Pine

Foss Hill

Install Fire Emergency Egress - Unit II - COMPLETE

SLF

36

161 Cross St

Freeman AC

Exterior concrete repairs - COMPLETE

SLF

37

William St

Lowrise

Hot water line replacement - COMPLETE

Infrastructure

38

11 Vine St

11 Vine St

Paint House, Repair Back Porch, Upgrade Interior Lights  - COMPLETE

SLF-WF

39

125 Cross St

125 Cross St

Paint House, Upgrade Interior Lights, Remove Large Shrubs - COMPLETE

SLF-WF

40

168 Cross St

168 Cross St

Paint House, Remove or Trim Trees, Upgrade Interior Lights, replace casement windows - COMPLETE

SLF-WF

41

316 Washington St

316 Washington St

Repair Front Porch & Paint Exterior - COMPLETE

SLF-WF

42

34/36 Fairview

34/36 Fairview

Raze building - Includes abatement

RP

43

344 Washington St

344 Washington St

Repair rotted metal tread and remove and replace landing - COMPLETE

SLF

44

280 William St

CPP

Combustion control modifications, Boilers #1 & #2 - COMPLETE

Infrastructure

45

Church St

Davenport Campus Center

Repair Drainage Outside of Gr. Fl. Entrance - COMPLETE

SLF

46

202 Washington St

Gingerbread House

Replace flat roof

SLF

47

237 Church St

Hall Atwater

Install air flow meters on fume hoods - COMPLETE

A&AF

48

238 Church St

PAC

Repair steps north east corner - COMPLETE

A&AF

49

238 Church St

PAC

Repair walk north side - COMPLETE

A&AF

50

56 Hamlin

Physical Plant

Repair roof leaks and rotted wooden floor boards at elevator - COMPLETE

PP

51

1 Vine St

1 Vine St 

Relocate Existing Basement Laundry Equip.  -  COMPLETE

SLF-WF

52

186 Cross St

186 Cross St

Paint House, Remove Old Fence - COMPLETE

SLF-WF

53

324 Washington St

324 Washington St

Paint Exterior - COMPLETE

SLF-WF

54

343 High St

CAAS

Repair walk - COMPLETE

A&AF

55

283 Washington Terr

CFA R

Replace HVAC system servicing dance studio - COMPLETE

A&AF

56

271 Court St

English

Replace carpet & pad - COMPLETE

A&AF

57

Various

Fac/Grad

Repair and replace porches - 5 year plan

RP

58

Various

Fac/Grad

Repair and replace roofs - 5 year plan - COMPLETE

RP

59

William St

Lowrise

Repair steps & install handrails - COMPLETE

SLF

60

William St

Lowrise-Unit # E

Renovation- Interior & Exterior - COMPLETE

SLF

61

McMonaughy Dr

Mocon

Replace Loading Dock Doors - COMPLETE

SLF

62

McMonaughy Dr

Mocon

Replace Divider Curtain - COMPLETE

SLF

63

238 Church St

PAC

Repair water main - COMPLETE

A&AF

64

52 Home Ave

52 Home Ave

Paint House - COMPLETE

SLF-WF

65

Various

Campus

Clean Leaves from Gutters

SLF-WF

66

280 William St

CPP/Butterfield

Phase I Utility Master Plan - CHEFA - COMPLETE

Infrastructure

67

200 College St

French House

Paint Exterior, repair front porch - COMPLETE

SLF-WF

68

56 Hamlin

Physical Plant

Repair loading dock door - COMPLETE

PP

69

350 High St

Russell House

Repair walk - COMPLETE

A&AF

70

265 Church St

Science Center

Replace Halon fire suppression in computer room - COMPLETE

A&AF

71

240 Court St

240 Court St

Renovate Interior - COMPLETE

SLF

72

Lawn Ave

Butterfield C

Repair steps - COMPLETE

SLF

73

280 William St

CPP

Repair breaching Boiler # 1 - COMPLETE

A&AF

74

280 William St

CPP

Install catwalk for Boiler Cleaning - COMPLETE

A&AF

75

Foss Hill

Foss 2

Renovate walk - COMPLETE

SLF

76

High St

High St

Repair/replace walks - COMPLETE

A&AF

77

McMonaughy Dr

Mocon

Paint Interior - COMPLETE

SLF

78

237 High St

North College

Replace fan coils 3rd & 4th floors - COMPLETE

A&AF

79

237 Church St

Old Power Plant

Remedial repairs to valves & asbestos abatement - COMPLETE

Infrastructure

80

281 High St

Anthropology

Install steam boiler - COMPLETE

A&AF

81

Various

Campus

Balance chilled water loop

Infrastructure

82

Various

Campus

Repair Plaster Walls

SLF-WF

83

Washington Terr

CFA P Theater

Inspect and certify theater rigging - COMPLETE

A&AF

84

280 William St

CPP

Clean boilers - COMPLETE

Infrastructure

85

Church/Pine

Foss 9

Provide Handicapp Access-Entry,Bathroom, Lounge, Bedroom & Laundry - COMPLETE

SLF

86

161 Cross St

Freeman AC

Re-stripe Outdoor Track - COMPLETE

SLF

87

McMonaughy Dr

Mocon

Replace Skylight - COMPLETE

SLF

88

Church St

PAC

Hydraulic cylinder replacement - COMPLETE

PP

89

56 Hamlin

Physical Plant

Upgrade Men's & Women's Rooms - COMPLETE

PP

90

Various

Campus

Purchase and installation of two blue light telephones on stanchions - COMPLETE

PP

91

280 William St

CPP

Install non chemical water treatment on tower - COMPLETE

Infrastructure

92

Church St

Davenport Campus Center

Replace Air Handler at P.Office - COMPLETE

SLF

93

230 Washington St

Greenhouse Residence

Move laundry from basement to 1st floor - COMPLETE

SLF

94

237 High St

North College

Insulate piping in walls & ceilings - COMPLETE

A&AF

95

237 High St

North College

Replace converters & AHU's, install DDC - COMPLETE

A&AF

96

238 Church St

PAC

Repair bluestone steps north east corner to drive - COMPLETE

A&AF

97

265 Church St

Science Center

Repair wall - COMPLETE

A&AF

98

96 Lawn Ave

96 Lawn Ave

Repair bank

SLF-WF

99

Various

Campus

Roof replacement/repair to be specified - COMPLETE

A&AF

100

283 Washington Terr

CFA P Theater

Lighting support and ladder cage - COMPLETE

A&AF

101

283 Washington Terr

CFA R

Replace dance floor - COMPLETE

A&AF

102

280 William St

CPP

Burner modifications boiler #1 & #2 - COMPLETE

Infrastructure

103

222 Chruch St

Davenport Campus Center

Hydraulic cylinder replacement - COMPLETE

PP

104

Wyllys St

Fayerweather Gym

Replace all malfunctioning plumbing fittings - COMPLETE

SLF

105

Freeman AC

Freeman AC

Women's Hockey Locker room bathroom repairs and new rubber matting - COMPLETE

SLF

106

161 Cross St

Freeman AC

Replace doors and locksets throughout building - COMPLETE

SLF

107

202 Washington St

Gingerbread House

Remove garage/install fence - COMPLETE

SLF

108

McMonaughy Dr

Mocon

Upgrade Lighting in Service Area - COMPLETE

SLF

109

238 Church St

PAC

Replace built in box gutter Deferred

A&AF

110

229 High St

South College

Repair HVAC piping insulation - COMPLETE

A&AF

111

Church St

VVO

Repair roof - COMPLETE

A&AF

112

McMonaughy Dr

VVO/Mocon

Renovate drive to allow fire truck access and install chillded water lines to Mocon while pavement is removed. - COMPLETE

A&AF

113

Church St

"C" Lot

Repair upper "C" Lot, connect drain to storm - COMPLETE

A&AF

114

156 High St

156 High St

Repair/widen/curb drive - COMPLETE

SLF

115

Various

Campus

Remove dead/dying Hemlocks - COMPLETE

A&AF

116

Foss Hill

Foss 1

Renovate patio - COMPLETE

SLF

117

161 Cross St

Freeman AC

Repair and crown Lower Long Lane 1 Field - COMPLETE

SLF

118

95 Pearl St

Humanities

Repair/replace bluestone walk - COMPLETE

A&AF

119

207 High St

Judd Hall

Hydraulic Cylinder Replacment - COMPLETE

PP

120

56 Hamlin

Physical Plant

Replace windows - COMPLETE

PP

 

178 Cross St

PIMMS

Install chimney liner - COMPLETE

A&AF

123

281 High St

Anthropology

 Install chimney liner - COMPLETE

A&AF

124

167/169 High St

Argus

Install chimney liner - COMPLETE

A&AF

125

Washington Terr

CFA Complex

Replace isolation and control valves - COMPLETE

A&AF

126

280 William St

CPP

Equipment trolley - COMPLETE

A&AF

127

301 High St

Davison Art Center

Install chimney liner -COMPLETE

A&AF

128

343 Washington Terr

East Asian Studies

Install chimney liner - COMPLETE

A&AF

130

279 Court St

English

Install chimney liner - COMPLETE

A&AF

131

161 Cross St

Freeman AC

Safety inspection and repairs to basketball hoops and batting cage - COMPLETE

SLF

132

Cross St

In Town Units 24 & 25

Interior & Exterior Renovations-complete. Recommended revisions: clean existing carpeting, repair siding, new solid material in basement windows, replace 2nd floor non-functioning windows, new exterior lights, new front steps, remove porch, paint exterior, seal fireplaces, new stove and new blinds, replace retaining wall. - COMPLETE

SLF

133

Cross St

In Town Units 26 & 27

Interior & Exterior Renovations-complete. Recommended revisions: clean existing carpeting, repair siding, new solid material in basement windows, replace 2nd floor non-functioning windows, new exterior lights, new front steps, remove porch, paint exterior, seal fireplaces, new stove and new blinds, repair front entrances, repair concrete. - COMPLETE

SLF

134

Wyllys St

North Field

Replace fence - COMPLETE

SLF

136

255 Pine St

Physical Plant

Replace fuel oil tank - COMPLETE

A&AF

137

171 Church St

Religion

Install chimney liner - COMPLETE

A&AF

138

300 High St

Romance Languages

Install chimney liner - COMPLETE

A&AF

139

265 Church St

Science Center

Engineering analysis of retaining wall - COMPLETE

A&AF

140

229 High St

South College

Replace casement window in President's Office - COMPLETE

A&AF

141

284 High St

Women's Studies

Install chimney liner - COMPLETE

A&AF

142

190 High St

WSA

Install chimney liner - COMPLETE

A&AF

143

109 Cross St

109 Cross St

House to remain vacant - COMPLETE

SLF-WF

144

95 Pearl St

Center for Humanities

General Major Maintenance - COMPLETE

A&AF

145

255 High St

Center for the Americas

Replace condensate return lines - COMPLETE

A&AF

146

255 High St

Center for the Americas

Re-deck porch, rebuild railing - COMPLETE

A&AF

147

171 Church St

Religion

Replace condensate return lines

A&AF

148

350 High St

Russell House

Install chimney liner - COMPLETE

A&AF

149

265 Church St

Science Center

Replace isolation valves

A&AF

150

265 Church St

Science Center

Rebuild AHU's - COMPLETE

A&AF

151

265 Church St

Science Center

Engineering Analysis for repair of retaining wall - COMPLETE

A&AF

152

Church St

Davenport Campus Center

Add Floor Drain to Mens Room on 2nd Fl - COMPLETE

SLF

153

Church St

Davenport Campus Center

Replace Tile Floor in Grille Area - COMPLETE

SLF

154

Foss Hill

Foss 4

Repair walk at north west entrance - COMPLETE

SLF

155

161 Cross St

Freeman AC

Wesleyan Arena chiller investigation and maintenance - COMPLETE

SLF

156

161 Cross St

Freeman AC

Irrigate Lower Long Lane 2 Field - COMPLETE

SLF

157

202 Washington St

Gingerbread House

Repair walk - COMPLETE

SLF

158

Cross St

In Town Units 22 & 23

Interior & Exterior Renovations-complete. Recommended revisions: clean existing carpeting, repair siding, new solid material in basement windows, replace 2nd floor non-functioning windows, new exterior lights, new stove and new blinds, repair concrete, curbs and walks, replace powder room (22) and entry floors (22/23). - COMPLETE

SLF

159

330 High St

University Relations

Paint exterior - COMPLETE

A&AF

160

66 Home Ave.

66 Home Ave.

Replace fence - COMPLETE

SLF-WF

161

69 Fountain

69 Fountain

Repair Stucco Walls, New Roof, Paint House, Repair Porches - COMPLETE

SLF-WF

162

70 Wyllys St

Admissions

Repairs to interior walls & ceilings - COMPLETE

A&AF

163

356 Washington St

Armstrong Annex

Repair & Repaint Exterior - COMPLETE

A&AF

164

Lawn Ave

Butterfield A&B Lounge

Remove Curtains & Replace Flooring in Kosher Kitchen Area - COMPLETE

SLF

165

280 William St

CPP

Engineering analysis of turbine generator -COMPLETE

Infrastructure

166

301 High St

DAC CarHS photo studio

Replace carpet, paint - hallway and gallery - COMPLETE

A&AF

167

Church St

Davenport Campus Center

Replace Interior Glass Doors on Gr. Fl.

SLF

168

Foss Hill

Foss 5

Repair wall-south side

SLF

170

Lawn Ave

Greenhouse

Repair walk - COMPLETE

A&AF

171

McMonaughy Dr

Mocon

Carpet Offices - COMPLETE

SLF

172

237 Church St

Shanklin

Repair granite steps - COMPLETE

A&AF

173

318 High St

University Relations

Exterior repairs & paint - COMPLETE

A&AF

174

230/240/256 Washington Street

230/240/256 Washington Street

Repave alley way behind these buildings - COMPLETE

SLF

175

Wyllys St

Alumni/Fayerweather

Paint exterior - COMPLETE

SLF

176

140 Church St

Barn

Pave Parking area - COMPLETE

RP

177

Campus

Campus

Continue campus rekeying

A&AF

178

283 Washington Terr

CFA C World Music

Humidity Control-Phase I - COMPLETE

A&AF

179

285 Court St

English

Electrical service upgrade/support classroom initiative - COMPLETE

A&AF

180

Wyllys St

Fayerweather Gym

Repair skylight above drum room

SLF

181

Foss Hill

Foss 6

Widen/repair walk - COMPLETE

SLF

182

Lawn Ave

Hall Atwater

Replace reverse osmosis system - COMPLETE

A&AF

183

265 Church St

Science Center

Repair bank/install steps to Lawn Ave. houses

A&AF

184

77 Pearl St

University Relations

Exterior work to preserve building, library upgrades - COMPLETE

A&AF/RP

185

281 High St

Anthropology

General Major Maintenance - COMPLETE

A&AF

187

Lawn Ave

Butterfield Dorms

Replace shrubs.

SLF

188

283 Washington Terr

CFA

Pave worn corners of walks and replace lighting - COMPLETE

A&AF

189

283 Washington Terr

CFA F Music Studios

Paint interior throughout - COMPLETE

A&AF

190

Church St

Davenport Campus Center

Replace Carpeting in Post Office - COMPLETE

SLF

191

301 High St

Davison Art Center

Repair/replace bluestone walk and site lighting - COMPLETE

A&AF

192

64 Harbor Dr

Macomber Boat House

Install heating system in lower garage bays- COMPLETE

SLF

193

McMonaughy Dr

Mocon

Replace Tile Throughout Kitchen Area - COMPLETE

SLF

194

238 Church St

PAC

Replace pneumatics w/DDC - COMPLETE

A&AF

195

300 High St

Romance Languages

Paint windows, doors & trim - COMPLETE

A&AF

196

41 Lawn Ave

Upward Bound

Install Danfoss valves on radiators - COMPLETE

A&AF

197

167/169 High St

Argus

General Major Maintenance - COMPLETE

A&AF

198

Lawn Ave

Butterfield A&B Lounge

Renovate Lounge Space

SLF

199

283 Washington Terr

CFA L Art workshop 006

Replace existing casework - COMPLETE

A&AF

203

Washington Terr

CFA M Zilkha Photo Shop

Replace Casework - COMPLETE

A&AF

204

Foss Hill

Foss 7

Repair wall-west side

SLF

205

Foss Hill

Foss 7

Repair wall-north end

SLF

206

161 Cross St

Freeman AC

Upgrade irrigation on baseball field - COMPLETE

SLF

207

283 Washington Terr

CFA P Theater

Jackhammer on north east corner for the drain - COMPLETE

A&AF

208

Church/Pine

Foss 8 Lounge

Renovate Lounge Space

SLF

209

283 Washington Terr

CFA G Art Studio So. Woodshop

Ceiling mtd. reel type power cords - COMPLETE

A&AF

210

283 Washington Terr

CFA M Zilkha Gallery

Perform needs evaluation of gallery lighting, flooring and window treatments.

A&AF

211

Church St

Davenport Campus Center

Miscellaneous painting

SLF

212

McMonaughy Dr

Mocon

Upgrade Sound System - COMPLETE

SLF

213

110 Mount Vernon

Wes Press

Paint exterior  -  COMPLETE

A&AF

214

Foss Hill

Foss 4

Repave patio w/asphalt and bluestone edge - COMPLETE

A&AF

  SLF = Student Life Facility   A&AF = Academic & Administrative Facilities   RP = Rental Property   PP = Physical Plant   

SLF/WF = Student Life Facility, Woodfrrame

UPDATED 12/2/03