Major Maintenance FY 2016
Project Manager:  Roseann Sillasen


Locations and Scope of Work Subject to Change-

It is the Viewer's Responsibility to Check Back Frequently

for the Most Current Information

 

Wesleyan University is committed to sustainability and environmental stewardship.  Emphasis has been placed on waste reduction, recycling,

environmentally preferable purchasing, energy conservation and the use of materials that are either harvested through sustainable methods or

made from recyclable materials.

  Historical Information for work performed MM FY15

The following link provides before and after photographs of MM FY16 work approved and completed Summer 2015:

Major Maintenance Slide Show -Completed projects FY16

The following link provides before and after photographs of MM FY15 work approved and completed Summer 2014:

Major Maintenance Slide Show - Completed projects  FY15  

 

CROSS STREET SIDEWALK REPLACEMENT BETWEEN FOUNTAIN AVENUE AND PINE STREET

Design Drawings dated 5/22/2015

Design Specifications dated 5/2015

Existing water service elevations in Cross Street woodframes

City of Middletown Cross Street sewerage plan

Addendum #1 dated 5/27/2015

Proposal Form dated 5/27/2015

Addendum #2 dated 5/28/15

Proposal Form dated 5/28/15

Addendum #3 dated 5/29/15

AAL DB9 Decorative Light Pole Specification

CLARK HALL RESIDENTIAL DORMITORY CARPET REPLACEMENT

PREBID IS TODAY, APRIL 16, 2015 AT 1:30 PM

INVITATION FORM

PROPOSAL FORM

PHOTOS

FLOOR PLANS AND SCOPE OF WORK

 

 

 


22 BRAINERD AVENUE DOCUMENT CENTER

Contractor Sign In Sheet

ADDendum #1 Dated 4/3/15

BID PACKAGES #4, #14 & #15 DOCUMENT CENTER

Contractor Sign In Sheet

Addendum #1 Dated 3/17/15

Addendum #1 Proposal Form Dated 3/17/15

ADDendum #2 Dated 3/24/15

ADDendum #2 53 AB Home Electrical Panel/Interior Garage Door Dated 3/24/15

 

 

BID PACKAGES #1, #2 & #7 DOCUMENT CENTER

Contractor Sign In Sheet

Addendum #1 Dated 3/18/15

Addendum #1 Proposal Form Dated 3/18/15

Addendum #1 21 Vine Street Dated 3/18/15

Addendum #1 23 AB Vine Street Dated 3/18/15

Addendum #1 41 Fountain Ave Dated 3/18/15

Addendum #1 168 Cross Street Dated 3/18/15

Addendum #1 266 Pine Street dated 3/18/15

Addendum #1 Spec Sec 10801 USE FOR ALL BID PACKAGES

ADDendum #2 Dated 3/24/2015

ADDendum #2 Revised Proposal Form Dated 3/24/15

 

BID PACKAGES #5, #5A, #5B, 6, 10, 10A DOCUMENT CENTER

Contractor Sign In Sheet

Addendum #1 Dated 3/18/2015

Addendum #1 LoRise Bathroom Renovations Dated 3/18/15

Addendum #1 LoRise Typical Electrical Dated 3/18/15

Addendum #1 Foss Hill Bathroom Partition Replacement Dated 3/18/15

ADDendum #2 Dated 3/24/2015

ADDendum #2 Revised Proposal Form Dated 3/24/15

 

BID PACKAGE #3, #3A, #3B, #8, #12 DOCUMENT CENTER

Contractor Sign In Sheet

Addendum #1 Dated 3/22/2015

Addendum #1 356 Washington Street Dated 3/22/15

Addendum #1 167-169 High Street Photo Scope Dated 3/22/15

ADDendum #2 Revised Proposal Form Dated 3/24/15

 

 

BID PACKAGE #13, #13A, #13B, #13C, #13D, #13E DOCUMENT CENTER

Contractor Sign In Sheet

264 Court Street: Proposed Device Locations

18/20 Brainerd Ave: Proposed Device Locations

49 Brainerd Ave: Proposed Device Locations

134 Knowles Ave: Proposed Device Locations

240 Court St: Proposed Device Locations

Add/Alt:  41 Fountain Ave

Addendum #1 Dated 3/19/15

ADDendum #2 Dated 3/23/15

Addendum #2 - Available Hydrant Flow Data Dated 3/22/15

Addendum #2 - Domestic service building access Dated 3/22/15

 

 

THE FOLLOWING IS A LIST OF WORK THAT WILL BE COMPLETED SUMMER 2015. SCOPES WILL BE UPDATED AS THEY BECOME AVAILABLE.

THE FOLLOWING MANDATORY PRE-BID WALKTHROUGHS ARE SCHEDULED THE WEEK OF MARCH 9 - MARCH 12. BRING COPIES OF THE SCOPES WITH YOU TO THE PRE-BID. BIDDING IS BY INVITATION.

  • MARCH 9, 2015 FROM 8:30 AM - 11:30 AM: BID PACKAGES 4, 14 & 15
    • Proposal Form BP #4, #14, #15
  • MARCH 9, 2015 FROM 1:30 PM - 3:30 PM: BID PACKAGES 1, 2 & 7
    • Proposal Form BP #1, #2, #7
  • MARCH 10, 2015 FROM 1:30 PM - 3:30 PM: BID PACKAGES 5, 5A, 6 & 10, 10A
    • Proposal Form BP# 5, 5A, 5B, 6, 10, 10A
  • MARCH 11, 2015 FROM 8:30 AM - 11:30 AM: BID PACKAGES 3, 3A, 3B , 8 & 12
    • Proposal Form BP #3, 3A, 3B, 8, & 12 posted 3/16/15
  • MARCH 11, 2015 FROM 1:00 PM - 3:30 PM: BID PACKAGE 13, 13A, 13B, 13C, 13D, 13E
  • MARCH 12, 2015 FROM 9:00 AM - 10:30 AM: BID PACKAGE 9 PRE-BID HAS BEEN CANCELLED.  THIS WORK HAS BEEN DEFERRED TO TY17

 

  • ROOFING BID PACKAGE IS IN THE PROCESS OF BEING DEVELOPED

  • CROSS STREET WALK REPLACEMENT BETWEEN FOUNTAIN AVE AND PINE STREET / DOMESTIC WATER RELOCATIONSIN DESIGN
  • CLASSROOM RENOVATION BID PACKAGE IS IN THE PROCESS OF BEING DEVELOPED

BID PACKAGE IDENTIFICATION IS LISTED BELOW IN THE PROJECT DESCRIPTION.   BIDDING IS BY INVITATION. CONTACT Roseann Sillasen WITH YOUR INTEREST TO BID.

 

Project Specifications for all projects:

    MM FY16 Project Manual Divisions 0-1

    MM FY16 Project Manual Divisions 2 - 16

    MM FY16 Project Specifications: Attachments, Exhibits, Stair Detail - Part of the Project Manual

Sample partial lien waiver

Sample final lien waiver

Hazardous Material Reports by Location: 18/20 Brainerd Ave, 21 Vine St23 Vine St, 35 Home Ave, 40 Home Ave, 41 Fountain Ave49 Brainard Ave, 53 Home Ave54 Home Ave, 55 Home Ave, 59 Home Ave, 63 Home Ave, 65 Lawn Ave, 73 Lawn Ave, 134 Knowles Ave, 168 Cross St169 High St, 200 High St, 207 Pine St, 240 Court St, 258 Court St, 264 Court St344 Washington St, 346 Washington St, 356 Washington St



Project Description Building Name Building Address Building Use Managed by Start / Completion
Photos/Scope Awarded Contractor
BP #1: Vinyl side exterior, porch repairs at south and east elevations;remove existing wood framed basement hatchway and install new metal framed basement hatchway system, paint all exposed paintable surfaces.  Owner to schedule abatement of transite siding. Student WF 142 Cross St SLF-WF Roseann Sillasen  May 27,2015 - July 24, 2015

 Photos

Scope/Drawings

 Superior Finishes
BP #1: Total kitchen renovation, bathroom flooring, electrical upgrade to code, new lighting, interior paint, floor finishes, exterior carpentry repairs. Vinyl siding. Student WF 168 Cross St SLF-WF Roseann Sillasen  May 27, 2015 - July 31, 2015

 Photos

Scope/Drawings

 CSS Morello
BP #2: Exterior painting & carpentry repairs. Wrap all window trim with coil stock. New exterior lighting. Student WF 266 Pine St SLF-WF Roseann Sillasen  May 27, 2015 - July 17, 2015

 Scope

 Photos

 Sifco, Inc.
BP 3B: Paint exterior of house with material appropriate for EFIS finish system. Perform EFIS repairs. Renovate south entry columns, header, entablature. Replace windows on south elevation, paint interior trim at all window replacement locations. Carpentry repairs to exterior window sills and paint. Carpentry repairs to north elevation entry system. Remove carpet common areas and install new flooring material, wood floor screening in bedrooms as identified, kitchen floor replacement. North stone patio repairs. Repairs to metal railings and prep and paint. Carpentry repairs to decorative wood railing at east elevation. Non-Traditional Dorm / Program House Buddhist House - 356 Washington  SLF Roseann Sillasen  May 27, 2015 - August 14, 2015

 Photos - Exterior

Photos - Interior

Scope/Drawings

 Kronenberger & Sons Restoration
BP #4: Total kitchen and bathroom renovations to apartments A & B, appliances, wall removal, electrical upgrades to code, new inteior lighting, plaster/gypsum wallboard repairs, paint interior in toto, floor finishes, wood panelling treatment, carpentry repairs. Access panel installations. Repairs to exterior vinyl siding and trim. Paint exterior paintable surfaces. Concrete stair repairs and metal railing prep and paint. Carpentry repairs to porch entries. New insulated glass windows, new azek exterior stops. Student WF 53 A/B Home Ave SLF-WF Roseann Sillasen  May 27, 2015 - August 14, 2015

 Photos

Scope/Drawings

 Green Village Builders
BP #5A: Owner to abate asbestos containing tile (ACT) in all bedrooms. Provide floor pret and install new vinyl composite tile (VCT) and vinyl perimeter base. Touch up paint from abatement. Moving expenses and storage of furniture by Owner.  32 beds Foss Hill Unit 2 Foss Hill Dr SLF Roseann Sillasen/ Jeff Sweet  May 27, 2015 - coordinate with summer camps

Scope/Drawings

Photos

 Olson Flooring
BP #6: Replace bathroom and shower partitions in Foss Hill 8, 9 & 10 bathrooms. Existing are rusting and peeling. Toilet rooms=28/Shower rooms=24. Install urinal partitions. Foss Hill 8-10 McConaughy Dr SLF Jeff Sweet

 May 27, 2015 - June 9, 2015

 July 26 -August 14, 2015

 Scope/Drawings
 Noble Construction
BP #7: Remove existing and install new insulated glass windows. Wrap exterior. Paint interior window trim. Student WF 207 Pine St SLF-WF Roseann Sillasen  May 27, 2015 - July 17, 2015

 Photos

Scope/Drawings

 Signature Construction
BP #1: Kitchen renovation with relocation of utilities. Bathroom renovation with relocation of vent pipe and drain. Electrical upgrades to code, new lighting, interior paint, new flooring, carpentry Student WF 41 Fountain Ave SLF-WF Roseann Sillasen  May 27, 2015 - July 24, 2015

 Photos

Scope/Drawings

 Rockfall Construction
BP #8: Remove north porch cheek walls, decking and framing. Install new pressure treated framing and new footings, composite decking, columns and railing system on existing masonry cheek walls. East porch soffit,framing and roofing/flashing replacement.  Masonry repairs. Paint. Student WF 73 A/B Lawn Ave SLF-WF Roseann Sillasen  May 27, 2015 - July 17, 2015

 Photos

Scope/Drawings

 Green Village Builders
BP #8: Remove existing and install new tongue and groove porch decking, new fascia boards and pressure treated framing and new ledger board. Restore metal railings and columns and paint. New wood steps. Paint. Coordinate work with occupied building. Provide signage to identify egress path of travel. Downey House 294 High St ACAD Roseann Sillasen  May 27, 2015 - August 7, 2015

 Photos

Scope/Drawings

 Superior Finishes
BP #8: Carpentry repair to curvilinear woodwork of window transoms above west entry door and wood columns repairs, hardware replacement with period style hardware to function with card access system. Non-Traditional Dorm / Program House 200 High St - Eclectic SLF Roseann Sillasen  May 27, 2015 - July 7, 2015

 Photos/Scope

 Superior Finishes
BP #4: Total kitchen renovation and (2) 2nd floor bathroom renovations, electrical upgrade to code, interior lighting, interior paint, floor finishes, carpentry repairs. Abatement above ceiling in intermediate level bedroom. Vinyl side exterior. Paint exterior paintable surfaces and architectural features. Carpentry repairs to porch entries. New insulated glass windows. Wrap window trim. Student WF 35 Home Ave SLF-WF Roseann Sillasen  May 27, 2015 - August 14, 2015

 Photos

Scope/Drawings

 Robison Construction

BP #9: Envelope Assessment and Design

Deferred: Repairs to existing steel windows (hinges/operators/hardware) and new gasket installation, prep and paint all windows, and caulk exterior.

Olin Library 252 Church St ACAD Roseann Sillasen July 1, 2015

 

 WJE
BP #10 BUILDINGS A & E / BP #10A BUILDINGS B, C & D: Complete renovation of all bathrooms in LoRise.  Existing fiberglass enclosures leak. New walls, insulation, wiring, flooring, tub and shower enclosures, shower doors, vanity and sink. Reinstall all commodes. Provide all plumbing piping, drains, supplies, shut offs, connections.  Total 34 locations Low Rise William St SLF Roseann Sillasen  May 27, 2015 - August 14, 2015

Photos

Scope/Drawings

 Units A & E: Aresco Construction

Units B, C & D: G. Donovan Associates

Chilled water repairs to Vault A located in grass on College Row, system repairs in campus wide tunnels. Replacement of underground chilled water supply and return from CFA Dance to Zilkha Gallery; Replacement of underground steam line from CPP to west side of High Street Crossing. Utilities Infrastructure replacement Campus wide INFRA Alan Rubacha/ Peter Staye  Various   Carpenter Consruction
Renovate kitchen and bathoom on second floor of 22/24 Brainerd.  Install additional electrical in kitchen to meet code. New flooring in kitchen and bathroom. New lighting. Graduate 22 Brainerd SLF Roseann Sillasen  

 Photos

Scope/Drawings

BP #1: Renovate kitchen in toto and modifications to bathroom,  electrical upgrades to code, new lighting throughout, new flooring, stair treads.  Complete interior paint. Student WF 29 Miles SLF Roseann Sillasen  May 27, 2015 - July 24, 2015

 Photos

Scope/Drawings

 Rockfall Construction
BP #5: Provide floor prep and install new vinyl composite tile (VCT) and vinyl perimeter base. Touch up paint from abatement. Moving expenses/storage of furniture by contractor. Owner to abate asbestos containing tile (ACT) in all bedrooms/coordinate schedule with owner.160 Bedrooms Butterfield C 50 Huber Ave SLF Roseann Sillasen  May 27, 2015- August 14, 2015

 Photos

Scope/Drawings & Room Type Location Drawings

 EGI

Ramco

William B Meyer, Inc

Commercial Custom Carpet

BP #7: Kitchen and bathroom renovations to unit A & B, electrical upgrade to code, lighting, interior paint, floor finishes, carpentry. Student WF 23 Vine St SLF-WF Roseann Sillasen  May 27, 2015 - July 31, 2015

 Photos

Scope/Drawings

 CSS Morello
BP #4: Kitchen, full bathroom and half bathroom renovations to unit A & B, electrical upgrade to code,lighting, interior paint, floor finishes, carpentry. Paint exterior paintable surfaces. Carpentry repairs to address all porch entries (4).  Vinyl side exterior. Wrap all window trim with coil stock.
Student WF 63 A/B Home Ave SLF-WF Roseann Sillasen  May 27, 2015 - August 14, 2015

 Photos

Scope/Drawings

 Green Village Builders
BP #7: Total kitchen and bathroom renovations, electrical upgrade to code, lighting, interior paint, floor finishes, carpentry, exterior lighting.  Vinyl side exterior. Student WF 21 Vine St SLF-WF Roseann Sillasen  May 27, 2015 - July 31, 2015

 Photos

Scope/Drawings

 Green Village Builders
BP #2: Prep and paint all exposed sides of exterior concrete decks including ceilings and all metal columns and railings. Surface concrete repair. Foss Hill Complex Foss Hill Dr SLF Roseann Sillasen  May 27, 2015  - July 17, 2014

 Photos

Scope/Drawings

 Superior Finishes
BP #11: Replace Cross Street sidewalk on south elevation from Fountain Avenue to Pine Street; requires lowering of grade approximately 18" to 24", utility relocations and connections, tree removal, regrading, landscaping, tree and hedge plantings, placement of new grass, drainage, access routes to residence entries, stairs and railings to residences. Place stamped concrete border in strip along road to match sidewalk replacement on Cross Street from FAC to Fountain.  Cross Street Side Walks Cross Street INFRA Roseann Sillasen  May 27, 2015 - August 1, 2015

 Photos

Scope/Drawings

 DeRita Construction
BP #3: Install new insulated glass windows- extensive wood framing and trim replacement. Replace garage doors, framing and trim. Paint exterior of house. Student WF 346 Washington St SLF Roseann Sillasen DEFERRED

 Photos

Scope/Drawings

 
BP #3A: Prep and paint exterior, stucco and masonry repair, carpentry repair, metal railing prep and painting. Non-Traditional Dorm / Program House 344 Washington St SLF-WF Roseann Sillasen  May 27, 2015 - July 24, 2015

 Photos

Scope/Drawings

 Superior Finishes
Replace bluestone sidewalk on north elevation from High St to entrance with asphalt walk. Davison Art Center 301 High St ACAD Tom Policki      DeRita Construction

BP #2: Paint all exposures of concrete balcony and railings. Perform all required prep/patch to concrete surfaces and railings/uprights.

Landscape and paver installation

Center for Humanities 95 Pearl St ACAD Roseann Sillasen  May 27, 2015 coordinate with offices

 Photos/Scope

Layout

 Superior Finishes

Stonehedge

Replace asphalt walkways throughout the Foss Hill complex with new asphalt. Walkway width to be increased. Install new asphalt curbing. Placement to address proper drainage. Provide drainage grates and utility covers as required. Foss Hill pathways Foss Hill Dr SLF Alan Rubacha/ Rob Borman
 5/27/2015 coordinate with summer programs
   DeRita Construction
BP #12: Vinyl side exterior of building. Maintain architectural features. Tongue and groove decking replacement on High Street elevation.  Install new windows on 2nd floor. Prep and paint all paintable surfaces 167/169 High St 167/169 High St ADM Roseann Sillasen  May 27, 2015 coordinate with offices

 Photos

Scope/Drawings

 CSS Morello
BP #12: Install insulated glass windows, install new azek exterior stops. Paint interior window trim.  Graduate 258 Court Street RP Roseann Sillasen  DEFERRED FY17

 

 

BP #16: Replace roofing, gutters and downspouts, reflash chimneys.  Repair & repoint where needed.  

Additional roofing locations to be added.

  • 97 Lawn Avenue Asphalt Roof Replacement
  • Foss Hill Weshop Connector Standing Metal Seam
  •  
Faculty/Staff 272-278 Court St RP Roseann Sillasen  May 27, 2015 coordinate with occupants

 Photos

Scope/Drawings

 
BP #13: Replace windows/paint interior trim, carpentry repairs and paint exterior. Renovate 3rd floor to bedrooms and 1/2 bath. New addressable fire alarm system and fire sprinkler system and water supply. Downtown Village District (DVD) Zone Student WF 264 Court SLF-WF Roseann Sillasen  May 27, 2015 - August 14, 2015

 Photos-Exterior

Fire/Sprinkler Scope

Scope/Drawings

Proposed Device Locations

 DeRita Construction

Robison Construction

Schultz Electric

Simplex Grinnell

BP #14: Vinyl side exterior of building, wrap all window trim with coil stock, paint exterior paintable surfaces to maintain architectural detail. Porch replacements.
Student WF 85 Home Ave SLF-WF Roseann Sillasen  May 27, 2015 - July 17, 2015

Photos

Scope/Drawings 

 Superior Finishes

BP #15: Vinyl side exterior of building, new insulated glass windows, wrap all window trim with coil stock, paint exterior paintable surfaces to maintain architectural detail. Carpentry repairs to porches. Student WF 54 Home Ave SLF-WF Roseann Sillasen  May 27, 2015 - July 24, 2015

Photo

Scope/Drawings

 CSS Morello

BP #14: Vinyl side exterior of building, wrap all window trim with coil stock, paint exterior paintable surfaces to maintain architectural detail. Carpentry repairs. Student WF 66 Home Ave SLF-WF Roseann Sillasen  May 27, 2015 - July 17, 2015

Photos

Scope/Drawings

 Superior Finishes

BP #15: Vinyl side exterior of building, new insulated glass windows, wrap all window trim with coil stock, paint exterior paintable surfaces to maintain architectural detail. Carpentry repairs to porches. Student WF 55 Home Ave SLF-WF Roseann Sillasen  May 27, 2015 - July 24, 2015

Photos

Scope/Drawings

 CSS Morello

BP #14: Vinyl side exterior of building, new insulated glass windows, wrap all window trim with coil stock, paint exterior paintable surfaces to maintain architectural detail. Carpentry repairs to porches. Student WF 59 A/B Home Ave SLF-WF Roseann Sillasen  May 27, 2015 - July 17, 2015

Photos

Scope/Drawings

 Green Village Builders

BP #14: Provide new storm windows in locations where fixed storms are located. Stain exterior wood shakes, paint all paintable surfaces to maintain architectural detail. Carpentry repairs to porches. Rental Properties 40 Home Ave SLF-WF Roseann Sillasen  May 27, 2015 - July 17, 2015 coordinate with occupant

Photos

Scope/Drawings

 CSS Morello

BP 13A: Vinyl side exterior of building, wrap all window trim with coil stock, paint exterior paintable surfaces to maintain architectural detail. Replace front entry porches. Carpentry repairs to rear porches.

Convert 1st floor common room to new bedroom on first floor, (1) each unit

Install new addressable fire alarm and fire sprinkler system and water supply.

Student WF 18/20 Brainerd Ave SLF-WF Roseann Sillasen  May 27, 2015 - August 14, 2015

Photos

Fire/Sprinkler Scope

Scope/Drawings

Proposed Device Locations

 DeRita Construction

Robison Construction

Salafia Electric

FPT

BP #15: Vinyl side exterior of building, install new insulated glass windodws, wrap all window trim with coil stock, paint exterior paintable surfaces to maintain architectural detail. Carpentry repairs. Student WF 65 Lawn Ave SLF-WF Roseann Sillasen  May 27, 2015- July 24, 2015

Photos

Scope/Drawings

 Superior Finishes

BP #15: Vinyl side exterior of building, wrap all window trim with coil stock, paint exterior paintable surfaces to maintain architectural detail. Carpentry repairs. Graduate 55 Lawn Ave SLF-WF Roseann Sillasen  May 27, 2015 - July 10, 2015

Photos

Scope/Drawings

 CSS Morello

BP #14: West porch replacement with composite materials Student WF 48 Home Ave SLF-WF Roseann Sillasen May 27, 2015 - July 10, 2015

Photos

Scope/Drawing

CSS Morello

BP 13C: Convert lower level common room to bedroom, install new addressable fire alarm system and fire sprinkler system and water supply. Interior paint. New flooring. Student WF 134 Knowles Ave SLF-WF Roseann Sillasen  May 27, 2015 - August 14, 2015

Photos

Fire/Sprinkler Scope

Scope/Drawings

Proposed Device Locations

 DeRita Construction

CSS Morello

Salafia Electric

Simplex Grinnell

BP #13B: Create new bedroom in portion of common room. Install new addressable fire alarm system and fire sprinkler system and water supply. Interior paint. Student WF 49 Brainerd Ave SLF-WF Roseann Sillasen May 27, 2015 - August 14, 2015

Photos

Fire/Sprinkler Scope

Scope/Drawings

Proposed Device Locations

 DeRita Construction

CSS Morello

Salafia Electric

Simplex Grinnell

BP 13D: Install new fire sprinkler water service, new sprinkler system and new fire alarm system.
Student WF 240 Court St SLF-WF Roseann Sillasen May 27, 2015 - August 14, 2015

Photos

Fire/Sprinkler Scope

Scope/Drawings

Proposed Device Locations

 DeRita Construction

Schultz Electric

FPT

ACAD=Academic    Admin=Administrative    Infra=Infrastructure    RP=Rental Properties    SLF=Student Life Facilities   SLF-WF=Student Life Facilities-Woodframes     ATH=Athletics

CPP=Central Power Plant    AAF=Academic & Administrative Affairs    MH=Manhole    DDC=Direct Digital Controls    GFI=Ground Fault Interrupt   SW=southwest    ADA=Americans with Disabilities Act

CFA=Center for the Arts